The YEIDA has issued a formal invitation for competitive bids for the Yamuna Expressway Industrial Development Authority project, for C/o Remaining Left Side Service Along 120m Wide Road In Sector-22dand 22e Yea Wc-02 in Gautam Buddha Nagar, Uttar Pradesh, with an estimated contract value of Rs. 5,37,98,923. The bid opening date for this tender is 06-03-2025 and the last date for bid submission is 07-04-2025. Interested bidders for Yamuna Expressway Industrial Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Yamuna Expressway Industrial Development Authority - YEIDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date6 Mar 2025
Closing Date7 Apr 2025
Tender Amount₹ 5,37,98,923 
Notes
Download

AI Insights

Technical Capacity
... View More
The required prior work experience for the bidder is as follows: 1. For works more than 10.00 Lacs and up to 15.00 Lacs, the tenderer should have experience of at least two jobs equal to the bid value in the last four financial years. 2. For works more than 15.00 Lacs and up to 100.00 Lacs, the tenderer should have experience of at least two jobs equal to the bid value in the last four financial years. 3. For works more than 100.00 Lacs and up to 2000.00 Lacs, the tenderer should have experience of at least two jobs equal to the bid value or one work equal to 75% of the bid value in the last four financial years. 4. For works of 2000.00 Lacs and above, the tenderer should have experience of at least three works each equal to 40% of the bid value, or two works each equal to 60% of the bid value, or one work equal to 80% of the bid value in the last four financial years. The bidder needs to provide a list of works satisfactorily completed, with an attested copy of the experience certificate, including details such as the total number of certificates attached, name of work, amount of work done till date, actual date of completion, or if the work is in progress, the proposed date of completion. Specific percentages of similar works completed mentioned are 75%, 40%, 60%, and 80% of the bid value.

Costs

Summary

C/o Remaining Left Side Service Along 120m Wide Road In Sector-22dand 22e Yea Wc-02

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. With bricks of class designation 150 UPPWD/SOR-2020/16.7.1

4374

139

612141.3

... More
Laying spreading and compacting stone aggregate of specified sizes to WBM specifications including spreading in uniform thickness, hand picking. rolling with 3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber. applying and brooming requisite type of screening I binding material to fill up interstices of coarse aggregate watering and compacting to the required density (UPPWD/SOR-2020/16.4)

6302.58

381

2401598.11

... More
Supplying and stacking at site 63 mm to 45 mm size stone aggregate. (UPPWD/SOR-2020)

2892.85

2904

8402716.75

... More
Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using VG - 10 distributer including preparing the surface &cleaning with mechanical broom. with rapid setting bitamen emulsion-on W.B.M/W.M.M @ 0.25kg/sqmUPPWD/SOR-2020

15309

12

186769.8

... More
Providing and applying Prime coat with Bitumen emulsion prepared surface of granular base including cleaning of road surface and spraying Primer at the rate of 0.75 kg/sqm using mechnical means UPPWD/SOR-2020/YEIDA/Morth based

15309

27

427886.55

... More
Supplying and stacking at site 90 mm to 45 mm size stone aggregate. (UPPWD/SOR-2020)

1993.64

2850

5683169.87

... More
Supplying and stacking at site 53 mm to 22.4 mm size stone aggregate. (UPPWD/SOR-2020)

1416.08

2968

4202925.44

... More
Providing and carting of following dia RCC hune pipe S&S NP-3 Class & specials in site of work lowering of the same into trenches in depthb upto 1.50m below G.L true to alignment jointing with 1:2 cement mortar in coarse sand including excavation of earth below invert level pf pipe. 250mm dia NP-3 pipe (DAR/UPPWD/SOR-2020)

218.7

707

154784.93

... More
Supply Good Earth work in rough excavation banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embarkment for roads, flood banks, marginal banks and guide banks or filling up ground depressions all leads as per (MOST/A.R./YEIDA) For all kind of soil Based SOR 2020UPPWD

56648.8

389

22059042.72

... More
Supplying and stacking at site Moorum (UPPWD/SOR-2020/16.1.10)

1260.52

2935

3700193.43

... More
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.09 mm (Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using penetration grade bitumen CRMB-55 to the required line, grade and level to same as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. MOSTH/512(UPPWD/SOR-2020) 25mm compacted thickness with bitumen penetration of crmb-55

15309

205

3139110.45

... More
Extra for compaction of earth work in embarkment under optimum moisture conditions to give at least 97% of the maximum dry density (proctor density) UPPWD/DAR/SOR-2020

13122

9

125971.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.