Uttar Pradesh State Industrial Development Authority Tender
... More
The UPSIDA has issued a formal invitation for competitive bids for the Uttar Pradesh State Industrial Development Authority project, for Maintenance/upgradation Of Road No. 12, Road Of Plot No. E-11 To E-20 (gopalpur) And Road Cfc To Road No. 07 And Construction Of Rcc Drain (plot No. H-1 To H-7) And Culvert At I.a Sikandrabad Distt. Bulandshahar in Gautam Buddha Nagar, Uttar Pradesh. The bid opening date for this tender is 04-03-2021 and the last date for bid submission is 18-03-2021. Interested bidders for Uttar Pradesh State Industrial Development Authority tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Opening Date4 Mar 2021
Closing Date18 Mar 2021
Tender AmountRefer Documents
Costs
EMD
₹ 4,07,181Document Cost
₹ 5,352Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SIDC_563075_1Bid Award Id
ViewTender No
cd_2_98_230221Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
641.63
-
-
... More
Cement concrete with 2cm. gauge stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.
107.92
-
-
... More
Supply & Stacking of 45-63 mm gauge approved stone ballast (10cm loose) for patches & inter coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
641.63
-
-
... More
M-150 Brick work in 1:3 one cement : 3 cement and coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
34
-
-
... More
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
699.31
-
-
... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches.
935.9
-
-
... More
Cement concrete with 4cm. gauge stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.
197.6
-
-
... More
Supply & Stacking of 22.4-53 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
699.31
-
-
... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
8.36
-
-
... More
RCC in 1:1.5:3 in foundation including all material, labour, T & P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
239.3
-
-
... More
Supply & Stacking of crushed stone dust for consolidation of stone ballast as screening material including octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
268.19
-
-
... More
Providing and laying factory made chamfered edge cement concrete paver blocks (80mm thick M-40 grade) in footpath, park & lawns driveway or light & traffic parking etc. of required strength thickness and size/shape, made by table vibratory method using PU mould, laid in required color and pattern over 50mm thick compacted bad of coarse sand, compacting and prober embedding/ laying of interlocking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size & pattern, finishing & sweeping extra sand, all complete as per manufacture specifications & direction of Engineer-in-Charge.
7615.8
-
-
... More
Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge.
1340.94
-
-
... More
M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
283.15
-
-
... More
Same as above item but for 1 extra lead & lift.
6.32
-
-
... More
Finishing wall with water proof cement paint of approved make on new work with three coats to give an even shade including supply of all materials, labour, and T&P etc. required for proper completion of the work.
8.36
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements