Uttar Pradesh Jal Vidyut Nigam Limited Tender

... More
The UPJVN has issued a formal invitation for competitive bids for the Uttar Pradesh Jal Vidyut Nigam Limited project, for Routine maintenance of complete lighting system in Rihand Power Station Pipri for One Year in Sonbhadra, Uttar Pradesh, with an estimated contract value of Rs. 5,10,000. The bid opening date for this tender is 09-05-2018 and the last date for bid submission is 09-06-2018. Interested bidders for Uttar Pradesh Jal Vidyut Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Uttar Pradesh Jal Vidyut Nigam Limited - UPJVN Tender

Opening Date9 May 2018
Closing Date9 Jun 2018
Tender Amount₹ 5,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M.S. tor steel in plain work such as R.C.C. or R.B. work including binding for proper shape and including supply of steel and its wastage, bend hooks and authorized overlapping shall be measured .As per MORT&H specification clause 1600 sr. no. 14.2 (Including labour cess but excluding GST.)

29

1624000

56000

... More
R.C.C. work with cement, approved coarse sand and 20mm gauge approved stone grit in proportion of 1:1.5:3 in R.C.C. T-beam, slab, Roof and R.C.C. colums excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I binding wire and including necessary centering and shuttering etc. and supply of all materials, labour and T&P etc. required for proper competion of work. Binding wire of supplied by the contractor free of cost as per S.I. no. 288.. (Including labour cess, Royalty but excluding GST.)

380

2926000

7700

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with 2 % cement (OPC) with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour cess, Royalty but excluding GST.)

420

987000

2350

... More
Cement concrete with 4 cm gauge approved stone aggregate, coarse sand and cement in proportion 8:4:1 in foundation, mechanically mixed and vibrated including supply of all material, labour and T&P etc. required for proper completion of work. (Including labour cess, Royalty but excluding GST.)

90

468000

5200

... More
Providing brick edging on both sides of the road with M-150 class bricks 7cm wide and 11 cm deep laid with mud mortar including labour and supply of bricks finished to required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer in Charge. (Including labour cess but excluding GST.)

1

57500

57500

... More
Providing and laying of RBM (as granular base )from approved Haridwar quarry including cost of all materials, labour and T&P etc. required for proper completion of work. (Including labour cess, Royalty but excluding GST.)

100

110000

1100

... More
Providing and laying stone boulders of 25 to 60 kg weight, from approved Haridwar quarry including cost of all materials, labour and T&P etc. required for proper completion of work. (Including labour cess, Royalty but excluding GST.)

127

139700

1100

... More
M-150 class brick work in 1:3 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per PWD SI No. 307 (Including labour cess, Royalty but excluding GST.)

105

504000

4800

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502. (Excluding cost of bitumen, Including labour cess but excluding GST.)

3912

6259

1.6

... More
Providing and laying seal coat Type-C by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. (Excluding cost of bitumen, Including labour cess, Royalty but excluding GST.)

3912

105624

27

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Including labour cess but excluding GST.)

1100

121000

110

... More
12 mm thick plaster with 1 part of cement and 3 part of coarse sand over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. As per PWD SI No. 584a, Including labour cess, Royalty but excluding GST.)

420

71400

170

... More
Cement concrete with 2 cm gauge approved stone aggregate, coarse sand and cement in proportion 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of work. As per PWD SI No. 279 (Including labour cess, Royalty but excluding GST.)

7.7

46970

6100

... More
Earth work in excavation in ordinary soil in foundation trenches etc. including lifts upto 1.50 M and lead upto 30 M and including filling, watering and ramming of excavated earth into trenches or into space between sides of foundation trenches and removal and disposal of surplus earth as directed by the Engineer in Charge. (Including labour cess but excluding GST.)

3200

288000

90



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.