Uttar Pradesh Housing And Development Board Tender
... More
The UPAVP has issued a formal invitation for competitive bids for the Uttar Pradesh Housing And Development Board project, for Construction Of Precosted Rcc Boundary Wall Under Alankaar Yojna , At Govt. Inter College Marka, Govt. High School Samgara, Govt. High School Charka, Govt. High School Pakhrauli And Govt. Girls Inter College Baberu Dist. Banda in Banda, Uttar Pradesh, with an estimated contract value of Rs. 1,76,82,000. The bid opening date for this tender is 06-06-2025 and the last date for bid submission is 24-06-2025. Interested bidders for Uttar Pradesh Housing And Development Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Uttar Pradesh Housing And Development Board - UPAVP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Jun 2025
Closing Date24 Jun 2025
Tender Amount₹ 1,76,82,000
Costs
EMD
₹ 3,54,000Document Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPHDB_1046173_1Tender No
525/CDBund-02/AC-11/04 Dated- 04.06.2025Tender Authority
Uttar Pradesh Housing And Development Board ViewPurchaser Address
-Website
http://https://upavp.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
237.975
6586
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
43.838
7902
-
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).beams
87.675
8377
-
... More
Fencing with angle iron post placed at required distance embedded in
cement concrete blocks, every 15th post, last but one end post and corner
post shall be strutted on both sides and end post on one side only and
provided with horizontal lines and two diagonals interwoven with horizontal
wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the
two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost
of posts, struts, earth work and concrete work to be paid for separately).
Payment to be made per metre cost of total length of barbed wire used.
10020
16
-
... More
Mild steel or iron work of small sizes and sections such as holding down bolts,hold fast tierods,gratings etc. ( when not included in an over all rates) wrought to required from including supply of steel and its wastage including cost of bolts, nuts if required for and welding, grinding andmaking holes as required completion ofwork fabrication of holes doors,chaukhats nosing. (PWD 502)Y shape and 0.60 m hieght in 35x35x5 MS angle Y shape and 0.60 m hieght in 35x35x5 MS angle
4396.275
89
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more
340.054
7852
-
... More
Brick work with common burnt clay (non modular) bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand)
3575.888
818
-
... More
12 mm cement plaster of mix 1:6 (1 cement: 6 coarse sand)Ground Floor
10928.0625
250
-
... More
Finishing walls with water proofing cement paint of required shade :13.441 New work (Two or more coats applied @ 3.84 kg/10 sqm)
10928.0625
85
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for Lintels, beams, plinth beams, girders, bressumers and cantilevers
751.5
536
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for Columns,Pillars, Piers, Abutments, Posts and Struts.
776.55
699
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%