Uttar Pradesh Housing And Development Board Tender
... More
The UPAVP has issued a formal invitation for competitive bids for the Uttar Pradesh Housing And Development Board project, for Name Of Work Construction Of Precosted Rcc Boundary Wall Under Alankaar Yojna At Govt. High School Pipramaaf And Govt. High School Mahuabandha Dist. Mahoba in Mahoba, Uttar Pradesh, with an estimated contract value of Rs. 1,07,50,000. The bid opening date for this tender is 06-06-2025 and the last date for bid submission is 16-06-2025. Interested bidders for Uttar Pradesh Housing And Development Board tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Uttar Pradesh Housing And Development Board - UPAVP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Jun 2025
Closing Date16 Jun 2025
Tender Amount₹ 1,07,50,000
Costs
EMD
₹ 2,15,000Document Cost
₹ 5,310Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPHDB_1046321_1Tender No
525/CDBund-02/AC-11/04 Dated- 04.06.2025Tender Authority
Uttar Pradesh Housing And Development Board ViewPurchaser Address
-Website
http://https://upavp.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
103.86
6586
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
56.64
7902
-
... More
Brick work with common burnt clay (non modular) bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand)
236.08
6803
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
390.97
7852
-
... More
12 mm cement plaster of mix 1:6 (1 cement: 6 coarse sand)
5032.97
250
-
... More
Finishing walls with water-proofing on cement paint of approved make such as super snowcem, durrocem, robiacem, guttucem supercem quality and of required shade on undecorated wall surfaces (two coat) overone and including one coat white cement primer to give an even shade after thoroughly brushing the surface to powdered materials including curing and cost of all materials. DSR 13.44.1
5032.97
85
-
... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
2395.78
85
-
... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner
post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost
of posts, struts, earth work and concrete work to be paid for separately).Payment to be made per metre cost of total length of barbed wire used.
1888.69
16
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for :Lintels, beams, plinth beams, girders, bressumers and cantilevers
1076.48
536
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts and Struts
930.02
699
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete
396.56
285
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements