Uttar Pradesh Expressways Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Expressways Industrial Development Authority - UPEIDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date22 Dec 2023
Closing DateCancelled
Tender Amount₹ 5,01,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement. DSR 5.3 Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. RCC in Middle Beam & Top Band

391.59

3157503

8063.27

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 5.2.2. Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. RCC in Column in Superstructure.

223.77

1761244

7870.64

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases of columns, etc. for mass concrete . (DSR: 5.9.1) . Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. For Footing of Collumns & Tie Beam,

3197.69

588374

184

... More
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers : (DSR: 5.9.5). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. For Middle Beam & Top Band.

3313.46

1193012

360.05

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts : (DSR: 5.9.5). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. For Column.

5282.3

2092635

396.16

... More
Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). (DSR: 6.47). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. For Panels Upto Plinth

896.2

4429567

4942.61

... More
Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks in super structure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-Charge. (The payment of RCC band and reinforcement shall be made for seperately). (DSR: 6.47). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. For Panels in superstructure

1857.4

9180398

4942.61

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure & Super structure complete as per drawing and Technical Specifications. MoRTH Sl-14.2, Ref.: Section-1600. Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST.

1641.55

14419211

8783.9

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete . (DSR: 10.1). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. M.S. Angle size 50X50X6

9610.65

682836

71.05

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq. mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) (dsr rate/1.2127/1.01). Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST. DSR Vol-2 Code No- 16.53.

4308.76

1279098

296.86

... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 Itr/10 sqm over an under coat of primer applied @ 0.80 Itr/10 sqm of approved brand and manufacture . Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST.

427.14

59043

138.23

... More
Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Rate of work shall include cost of all material, labour,T&P etc. required for proper completion of work as directed by Engineer-in-Charge including all taxes,labour cess but excluding GST.

21386.93

2412660

112.81



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.