If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
UP State Construction And Infrastructure Development Corporation Limited - UPSCIDC Tender
Civil And Construction
Eprocure
Opening Date8 Mar 2025
Closing Date19 Mar 2025
Tender Amount₹ 16,77,099.56 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 34,000Document Cost
₹ 1,300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SCIDC_1014960_1Tender No
29/EE/Orai/ET/2024-25Tender Authority
UP State Construction And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://http://www.upscidc.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
4.8
5190
24912
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
11.7
6238
72984.6
... More
15 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.59 (ii)
36
199
7164
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
1.59
6500
10335
... More
Construciton of Nali Nirman From Shiv balak ke makan se Devi ji ke mandir tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
24
157
3768
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
8
1810
14480
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
8
5190
41520
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
20.2
6238
126007.6
... More
15 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.59 (ii)
60
199
11940
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
2.65
6500
17225
... More
Supply and fixing of MS sign Edge board including painting and lettering as directed by Engineer-in-charge.
1
10000
10000
... More
Construciton of Nali Nirman From Pappu ke makan se Ram ji ke mandir tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
16.8
157
2637.6
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
5.6
1810
10136
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
5.6
5190
29064
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
13.65
6238
85148.7
... More
15 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.59 (ii)
42
199
8358
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
1.86
6500
12057.5
... More
Construciton of Nali Nirman From Arun ke makan se Nala tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
12.48
157
1959.36
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
4.16
1810
7529.6
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
4.16
5190
21590.4
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
10.14
6238
63253.32
... More
15 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.59 (ii)
31.2
199
6208.8
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
1.38
6500
8957
... More
Construciton of Nali Nirman From Devi ji ke Mandir se Nala tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
49.68
157
7799.76
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
16.56
1810
29973.6
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
16.56
5190
85946.4
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
28.57
6238
178194.71
... More
12 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.58 (ii)
110.4
199
21969.6
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
6.26
6500
40664
... More
Construciton of Nali Nirman From Munna lal ke Makan se Munesh ke makan tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
10.56
157
1657.92
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
3.52
1810
6371.2
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
3.52
5190
18268.8
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
8.58
6238
53522.04
... More
12 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.58 (ii)
26.4
199
5253.6
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
1.17
6500
7579
... More
Construciton of Nali Nirman From Ram Avtaar ke Makan se Ramkumar ke makan tak
-
-
-
... More
Earth work in excavation in foundation in B.C. soil Lead up to 30m and lift up to 1.50 m i/c all complete as per directed by Engineer in charge.
8.4
157
1318.8
... More
Filling of Local sand having P.I. less then 5 in foundation or for stabilization of sub grade I/c all materials, labour, sprinkling of water as required , T&P, royalty, all taxes etc. required for proper completion of work
2.8
1810
5068
... More
Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 8:4:1 i/c all required for proper completion of work as per directed by Engineer in charge. As chapter 5 as S.I. No. 281
2.8
5190
14532
... More
Class-150 brick work in 1:4 cement and Fine sand mortar in foundation and plinth I/c all compelete chapter- 6 S.I. No. 305
6.83
6238
42574.35
... More
12 mm thick plaster with cement, fine sand mortar in proportion of 1:4 in fair side of wall I/c all required for proper completion of work as directed by engineer in charge, chapter 13 S.I. NO. 17.58 (ii)
37.1
199
7382.9
... More
C.C. work in 1:2:4 cement, coarse sand and 20mm gauge stone grit I/c all required for proper completion of work as directed by engineer in charge, chapter 5 S.I. NO. New item - (a)
0.93
6500
6032
... More
Electrical Work of Street light (30 nos) at Vill Doulatpura Kalpi,
-
-
-
... More
Supply and fixing of LED Street light Fittingwith mandatory driver set having die cast aluminium body with toughend glass uv stabilized pc Cover and lenses suitable for 140watt to 150watt and conferming to IP66 and IK07 and above protection having company logo engraved completein all respect .
40
10488
419525.6
... More
Supply and wiring of submain with two number 2.5
sq.mm. PVC insulated 1100 V grade single core
aluminium conductor cable in 20 mm dia heavy duty (2mm thick) PVC conduit with 1 nos. 1.5 sq. mm. FRLSH PVC insulated 1100 V grade multistrand single core copper conductor cable as earth continuity wire drawn inside the conduit complete in all respect.
400
121
48400
... More
Supply & erection of "D" clamps of 50 mm x 6mm flatiron on steel tubular poles / steel rail poles with bolts,nuts etc. complete in all respects including painting with aluminium paint .
80
223
17840
... More
S&F of 16 Amp. 240 V SPN metal clad rewireable type switch fuse unit on M.D.F.E.G. / Teak wood board complete in all respect.
40
676
27040
... More
S/f of street light bracket complete.
40
550
22000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements