State Urban Development Agency Tender
... More
The SUDA has issued a formal invitation for competitive bids for the State Urban Development Agency project, for Construction Of U-drain And Interlocking Road From Taule House To Chunne House At Moh. Sainik Colony In Ward No. 7 Ng Shahjahanpur. in Shahjahanpur, Uttar Pradesh. The bid opening date for this tender is 15-03-2021 and the last date for bid submission is 22-03-2021. Interested bidders for State Urban Development Agency tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
State Urban Development Agency - SUDA Tender
Opening Date15 Mar 2021
Closing Date22 Mar 2021
Tender AmountRefer Documents
Costs
EMD
₹ 54,637Document Cost
₹ 750Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SUDA_569963_1Bid Award Id
ViewTender No
4720/Duda/E-Tender/2020-21 Dt. 10-03-2021Tender Authority
State Urban Development Agency ViewPurchaser Address
-Website
http://http://sudaup.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in foundation in ordinary soil, loame, clay or sand including lift upto 1.5 m & Iead upto 30m Including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. As per SOR NO. 251.
21
-
135
... More
Cast cement concrete door sills, chaukhats boundry posts, shelves and similar small work with cement, approved coarse sand and 2 cm (3/4)"gauge' approved stone ballast in the proportion of 1:2:4 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24B.W.G.G.I. binding wire, and including the cost of binding wire, moulds nad all otehr materials, labour and T&P etc. required for proper completion of the work. As per SOR No. 282.
2.28
-
8540
... More
R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item but for Slab. As per SOR NO. 284.
1.3
-
8160
... More
Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. As per SOR NO. 504.
1
-
6250
... More
12 mm thick plaster with Cement and fine sand mortar of FM 1.25 over brick work minimum thickness not to be less than 3/8" (10 mm) thick including supply of all materials, labour and T&P etc. required for proper completion of the work. As per SOR No. 584.
84
-
150
... More
First class brick work in 1:4 cement and fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per SOR NO. 305.
28
-
5050
... More
Concrete with 4cm(1½"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 1:6:12 in foundation and under floor, including supply of all material Iabour and T&P etc.required for proper completion of the work. As per SOR NO. 273.
8.4
-
3230
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements