Rural Engineering Department Tender
... More
The Rural Engineering Department has issued a formal invitation for competitive bids for Construction. Of Cc Road From Pich Road Sanjay Kumar House To Primary School To Cc Road Ajay Gaur House Towards At Vill Lalapatti In Block Koilsa Azamgarh 27 in Azamgarh, Uttar Pradesh, with an estimated contract value of Rs. 21,59,000. The bid opening date for this tender is 28-03-2025 and the last date for bid submission is 04-04-2025. Interested bidders for Rural Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Engineering Department Tender
Opening Date28 Mar 2025
Closing Date4 Apr 2025
Tender Amount₹ 21,59,000
Costs
EMD
₹ 43,000Document Cost
₹ 1,194Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_REDUP_1021546_1Bid Award Id
ViewTender No
1333/RED/Tender/ST/2024-25 Dt 20.02.2025Tender Authority
Rural Engineering Department ViewPurchaser Address
-Website
http://http://upred.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling of brick soling (B.O.E.) old brick soling i/c all completion
387.75
8
3140.77
... More
12mm thick cement plaster in 1:4 cement and sand moltar including supply of all material, labour and T&P, etc. required for proper completion of work as per SI no- 584 A. Schedule Rate for Fine sand
220.67
145
31997.15
... More
Mild steel or iron plain work of small and section such as holding down bolts,hold fast,tie rods grating etc (When not included in over all rates) wrought torequired from including supply of steels and its wastage including all completion work .As per S.I.No-502
0.29
5350
1551.5
... More
Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate
100.57
110
11062.7
... More
Supply and fixing of 20mm granite stone sign board including all for proper completion of the work
0.27
2258
609.66
... More
First class b/w in 1:4 in cement and fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper S.I.No.305(b)
122.83
5982
734830.48
... More
Lettring and painting of stone sign board including all compleat work
74
15
1110
... More
R.C.C work with cement, aproved coarse sand and 20mm gauge aproved stone grit in the proportion of 1;2;4 in slab excluding supply of reinforcement and its bending but i/c its fixing and binding the same with 24B W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all material ,labour and T.P etc.required for proper being included in the item .as per S.I No-284
0.34
8100
2754
... More
Supply and fixing of 110mm dai PVC pipe (ISI Mark ) for cross drainage including all matterial labour etc at site.
6
221
1326
... More
Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273
62.19
3150
195898.5
... More
Supply and Laying of 125 micron Polything in betweenlean concrete and c.c slab.
479.4
37
17977.5
... More
Constrution of unreinforcement dowel, dowel jointed at expansion joint at M30 (GRADE0 Design mix as per MORD 1501
88.13
8078
711914.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements