The Rural Engineering Department has issued a formal invitation for competitive bids for Gram Patani Me Prathamik Vidhyalaya Me Khel Ka Maidan Open Jim Solar Light Karya. in Saharanpur, Uttar Pradesh, with an estimated contract value of Rs. 7,33,000. The bid opening date for this tender is 26-12-2024 and the last date for bid submission is 03-01-2025. Interested bidders for Rural Engineering Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rural Engineering Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date26 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 7,33,000
Costs
EMD
₹ 14,700Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_REDUP_986639_5Bid Award Id
ViewTender No
1108/RED/2024-25 dt 10-12-2024Tender Authority
Rural Engineering Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
(a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M.from the foundation trenches. (where machine can
not move ) As per S.I. No.-251(a)
30.84
90
2775.6
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.50:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire As per S.I. No.-289
1.83
7800
14274
... More
M-150 Brick Work in one white lime & Three Surkhi mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work As per S.I. No.-303
24.59
4090
100573.1
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. As per S.I. No.-283
3.94
6450
25413
... More
M.S. or iron work of Z Section window excluding Glass panes. including rivetting or welding where necessary. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work Openable panels FrorM.S. Grills,/Stair Case Railing Etc as per si no-502a
10.06
6150
61869
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and aiso including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt ) for small works/ Abadi area. (where machine can not move ). including cartage
As per Analysis of Rate.
259.95
191
49650.45
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. As Per Analysis
6.98
8311
58010.78
... More
Concrete with 4 cm. gauge Stone ballast, Corse sand. and cement, in proportion of 8:4:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
As per S.I. No.-281
6.17
4850
29924.5
... More
Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
As Per S.I. No.-279 (a)
1.42
5750
8165
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.50:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra R.C.C. Raft foundation and footing. As per S.I. No.-287(a)
1.52
6310
9591.2
... More
Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer-in-charge Horticulture D.S.R. 2020 item no 2.34
706.16
83
58943.18
... More
Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work
As Per S.E. (R.E.D.), Saharanpur Sanction
1
4300
4300
... More
Construction of Granular Sub Base by providing Well graded material, spreading in uniform layers with Motor grader/Tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with Rotavator at OMC and compacting with Smooth wheel roller to achieve the desired density complete as per Technical Specification Clouse 401
16.03
2015
32300.45
... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. As Per S.I. No.- As Per S.I. No-660+661
144.93
83
12029.19