Rural Engineering Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rural Engineering Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Jan 2025
Closing Date28 Jan 2025
Tender Amount₹ 13,60,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and aiso including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt ) for small works/ Abadi area. (where machine can not move ). including cartage As per Analysis of Rate.

271.95

191

51942.45

... More
Brick soling with straight over brunt bricks laid on edge and dry (labour only) including preparation of subgrade to prescribed camber, filling joints with local earth spreading a blinding coat 1 cm (3/8") depth of local earth over the entire surface and including labour T&P etc.required for proper completion of the work. As Per S.I. No.- 786

54.64

75

4098

... More
Brick soling with straight over brunt bricks laid on edge and dry including preparation of subgrade to prescribed camber, filling joints with local earth spreading a blinding coat 1 cm (3/8") depth of local earth over the entire surface and including labour T&P etc.required for proper completion of the work. As Per S.I. No.- 762B

50.36

390

19640.4

... More
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As per S.I. No.-273

12.87

2110

27155.7

... More
M-150 Brick Work in 1:4 (one cement & Four corse Sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work As Per S.I. No.- 305(a)

16.91

4690

79307.9

... More
12 mm thick plaster with cement and C sand of 2.20 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. As Per S.I. No.- 584

122.5

165

20212.5

... More
Cement Concrete with 2 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As Per S.I. No.-279 (a)

7.11

5750

40882.5

... More
Construction of Granular Sub Base by providing Well graded material, spreading in uniform layers with Motor grader/Tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with Rotavator at OMC and compacting with Smooth wheel roller to achieve the desired density complete as per Technical Specification Clouse 401

63

2300

144900

... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density as per Technical Specification Clause 405.(W.B.M. Grading-3) As Per S.E. (R.E.D.), Saharanpur Sanction

55.13

2954

162854.02

... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in proportion of 1:1.50:3 in cc pavement (theckness as perdesign) cement coarse & fine aggregate confirming to IS standard mixed in concrete mixture /Plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed form work (steel) channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools & plants etc. required for proper completion of work and also including complete shifting of Recron 38 fibre reinforcement material etcl & concrete et As Per New Item -9 Ch-20 complet shifting of matrials and concte etc (m 30)As Per New Item No.-9(1) Ch.-20

110.25

7300

804825

... More
Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work As Per S.E. (R.E.D.), Saharanpur Sanction

1

4300

4300



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.