Rajya Krishi Utpadan Mandi Parishad Tender
... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Sampark Marg Anirudh Singh Ke Ghar Se Tikri Harijan Basti Tak in Ayodhya, Uttar Pradesh, with an estimated contract value of Rs. 18,51,055. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 May 2025
Closing Date30 May 2025
Tender Amount₹ 18,51,055
Costs
EMD
₹ 1,86,000Document Cost
₹ 3,304Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1039248_1Bid Award Id
ViewTender No
U.N.(N.)AYO/(NIVIDA)/2025-1002 Dated 14.05.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Technical Specification Clause 510 and direction of Engineer-in-charge .
2601
71
-
... More
Providing & fixing of M.S. Sign Board as per approved Drawing of Mandi Parishad at road site including Painting with enamel paint and letter writing with road sign as per direction of E/I.
1
8000
-
... More
Earth in cutting or in embankment in ordinary soil , excavation to be done in form of regular pits not exceeding 1/2 M. in depth and work in embankment to be in 20 cm layers including ramming and dressing the surface to required level and slopes and also including 1.5 M. lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by the Engineer in charge
1071
110
-
... More
Supply and laying and fixing of 350 mm dia NP-3 R.C.C. Hume pipe with required collars including loading, unloading, cartage upto site. Supply of all materials all labour. T&P etc. and also including all other taxes/charges for proper completion of work as per direction of the Engineer in charge. Jointing of pipes shall be with 1:2 cement and course sand mortar.
7.5
1900
-
... More
Brick edging on both sides of roads of 1st class brick 8cm (3") wide & 12cm (4.50") deep laid with mud mortar including labour & suplly of bricks finished to required template and in proper alignment and also including dressing & ramming the excavated earth including all labour T&P sundries required for completion of work with material.
0.02
82000
-
... More
Maintenace cost of 2nd year after completion of work @1.00% of total work amount of item no 1 to 8
1
17219
-
... More
Maintenace cost of 3rd year after completion of work @1.50% of total work amount of item no 1 to 8
1
25828
-
... More
Maintenace cost of 4th year after completion of work @ 2.00% of total work amount of item no 1 to 8
1
34438
-
... More
Maintenace cost of 5th year after completion of work @ 3.00% of total work amount of item no 1 to 8
1
51657
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements