Rajya Krishi Utpadan Mandi Parishad Tender

... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Repairing Of Link Road Dallpur Pakki Sadak To Ekaghara in Gonda, Uttar Pradesh, with an estimated contract value of Rs. 57,90,699. The bid opening date for this tender is 12-04-2025 and the last date for bid submission is 25-04-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Opening Date12 Apr 2025
Closing Date25 Apr 2025
Tender Amount₹ 57,90,699 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hotmix plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.

4350

208

907845

... More
S/F of signboard as per direction of engineer in charge

2

12000

24000

... More
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clayor sand) including lift upto1.5 m. lead upto 50 m and dressing of side sand rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C with in a lead of 30 m.

20

125

2500

... More
(Item No. 01 To 08) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75%

1

24500

24500

... More
12mm.Thick plaster with1:3 cement and coarse sand mortar in plinth both side of brick work inner side15 cm below plinth and out side 15 cm below gound level including supply of all materials, labour and T&P etc. required for proper completion of the work.(583)

300

215

64500

... More
(Interlocking Work Item No. 14 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%

1

-

-

... More
(Item No. 01 To 08) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.00%

1

-

-

... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405

295.88

5465

1617058.17

... More
Supply Of Rubber module reflective Zig Zag 80 mm Thick.Precist Compressed C.C. Inter Locking as lock compressive strngth shall not be less then 30MPA and wight not less then 5.50kg each block including of 50mm thich bedding sand joint filling with sand all material labour T&P etc.required for proper complation of the work over the prepared base concrete as directed by Engineering-in-charge .

1050

850

892500

... More
Providing and laying Cement concrete 1:2:4 ( 1 cement : 2coarse sand : 4 graded stone grid 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors (S.I. No. 279b)

27.75

9100

252525

... More
(Interlocking Work Item No. 14 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%

1

4300

4300

... More
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clayor sand) including lift upto1.5 m. lead upto 50 m and dressing of side sand rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C with in a lead of 30 m.

36

125

4500

... More
(C.C. Work Item No. 25 T0 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%

1

2500

2500

... More
(C.C. Work Item No. 25 T0 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%

1

3700

3700

... More
(Item No. 01 To 08) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00%

1

97900

97900

... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405

86.63

5465

473454.61

... More
Class-150 brick work in1 :6 cement and coarse sand mortarin foundationand plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(S.I. 305b)

10.5

6000

63000

... More
(C.C. Work Item No. 25 T0 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%

1

1200

1200

... More
(C.C. Work Item No. 25 T0 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%

1

4900

4900

... More
Providing and laying Cement concrete 1:4:8(1cement :4 finesand :8graded brick aggregate 40 mm Stone Ballast. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, alsoincludingcostof formwork in foundation and floors.(S.I. No. 281)

3.75

7900

29625

... More
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

4350

16

69600

... More
(Item No. 01 To 08) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25%

1

73500

73500

... More
(Interlocking Work Item No. 14 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%

1

17300

17300

... More
Providing and laying Cement concrete 1:4:8(1cement :4 finesand :8graded brick aggregate 40 mm Stone Ballast. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, alsoincludingcostof formwork in foundation and floors.(S.I. No. 281)

13.5

7900

106650

... More
12mm.Thick plaster with1:3 cement and coarse sand mortar in plinth both side of brick work inner side15 cm below plinth and out side 15 cm below gound level including supply of all materials, labour and T&P etc. required for proper completion of the work.(583)

70

215

15050

... More
(Item No. 01 To 08) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50%

1

49000

49000

... More
(Interlocking Work Item No. 14 T0 19) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%

1

8700

8700

... More
(C.C. Work Item No. 25 T0 31) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%

1

-

-

... More
(Interlocking Work Item No. 14 T0 19)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%

1

13000

13000

... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Hotmix Plant.

4350

70

307110

... More
Class-150 brick work in1 :6 cement and coarse sand mortarin foundationand plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(S.I. 305b)

31.74

6000

190440

... More
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.

1087.5

110

119625

... More
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405

11.25

5465

61484.06



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.