Rajya Krishi Utpadan Mandi Parishad Tender
... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Maintenance And Repair Of Link Road From Karimpur To Sapnawat in Hapur, Uttar Pradesh, with an estimated contract value of Rs. 25,13,000. The bid opening date for this tender is 13-05-2025 and the last date for bid submission is 13-05-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date13 May 2025
Closing Date13 May 2025
Tender Amount₹ 25,13,000
Costs
EMD
₹ 2,55,000Document Cost
₹ 4,484Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1033078_1Bid Award Id
ViewTender No
735/DDC Dt-26.04.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
5100
15
80325
... More
Providing , laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant laying and rolling with a three wheel 80-100 kn static roller capacity finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.
5100
173
886635
... More
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using type B as per Technical Specification Clause 510
5100
65
333540
... More
Excavation in foundation in ordinary soil including lead upto 30 meter and lift upto 1.5 meter and including of excavated earth in to the trenches or in to the sapce of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer -in - charge upto a distance of 30 M. from the foundation trenches. S.I. No 251 (a)
9
108
980.1
... More
Concrete with 4 cm. Gauge stone ballast coarse sand and cement in proportion of 12:6:1 in including supply of aII material labour and T&P etc required for proper completion of the work. S.I. no 273a
3
5247
15742.5
... More
M-150 Brick work in 1:4 cement & coarse sand in foundation and plinth including supply of all materials labour tools & plants etc. required for completion of the work . S.I. No 305(a)
3.45
5118
17659.86
... More
Supply and laying of 100mm thick Precast cement concerete I-Shape' Interlocking paver blocks ISI mark confirming to IS: 15658-2006 with top layer of minimum 5mm thickness having plan dimension 200x(160+120mm) of O.P. Cement, smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 50Mpa and weigth 5 kg per including cost of material, with a blanket layer of 4.00cm. thick fine sand, including labour, T&P etc required for proper completion of the work as directed by Engineer-in-charge. SI New ITem 15 Page 48.
300
940
282000
... More
Supply and Fixing Sign Board
1
15000
15000
... More
PART B The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 1st year maintenance cost@0.0%
1
-
-
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1.50%
1
32775
32775
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 3nd year maintenance cost @ 3.00%
1
65550
65550
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 4nd year maintenance cost @ 4.50%
1
98325
98325
... More
The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years.( Including cost of material T&P labour but excluding GST) for 5nd year maintenance cost @ 6.00%
1
131100
131100
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements