Rajya Krishi Utpadan Mandi Parishad Tender

... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Sampark Marg Raihiya Garm Sabha Mandi Pich Road Se Adona Pich Tak Ka Nav Niraman Kay. (05 Yaer Anurajhan Avadhi Sahit) in Ballia, Uttar Pradesh, with an estimated contract value of Rs. 42,89,000. The bid opening date for this tender is 04-01-2025 and the last date for bid submission is 23-01-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 42,89,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 %

1

120000

120000

... More
WBM G-3 - Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405

281.25

4299

1209234.38

... More
WBM G-2 (Inter Coat) Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405

308.25

4086

1259663.63

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.00 %

1

80000

80000

... More
Providing and applying seal coat type "C" comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kN Static roller and finishing to required level and grades as per Technical Specification Clause 510 including cost of bitumen

3750

62

235875

... More
GSB- Gramular Sub-Base with well Graded Material (Table 400,1) A) By Mix in Place method Contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/Tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401

20.63

3506

72347.35

... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. As per technical specification clause 502 including cost of bitumen emulsion (SS-1)

3750

35

133875

... More
Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508 including cost of bitumen

3750

189

709500

... More
Earthwork in cutting or embankment /Pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layer's including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by E/I including labour T&P etc required for proper completion of work (as per SI No-253)

1965.75

100

196575

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 %

1

-

-

... More
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10)

3750

15

58125

... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50 %

1

60000

60000

... More
S/F of reflective sign board,etc

1

12000

12000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.