Rajya Krishi Utpadan Mandi Parishad Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Works
Civil And Construction
Eprocure
Opening Date7 Feb 2025
Closing Date27 Feb 2025
Tender Amount₹ 1,85,85,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WBM Grading-2 Providing & laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 Kn static roller in stages to proper grade and camber appling and brooming crushable screening to fill-up the interstice of coarse aggregate watering and compacting to the required density Grading 2 as per Technical specification Clause 405 Mord Book Page No. 4-18

165.87

3162

524480.94

... More
WBM Grading-3 Providing & laying spreading and compacting stone aggregates of specifice size to water bound macadam specification including spreading in uniform thickness hand packing rolling with three wheel 80-100 Kn static roller in stages to proper grade and camber appling and brooming crushable screening to fill-up the interstice of coarse aggregate watering and compacting to the required density Grading 3 as per Technical specification Clause 405 Mord Book Page No. 4-18

548.42

3226

1769202.92

... More
Supply and laying of 100 mm thick precast cement concrete I-Shape interlocking paver blocks ISI mark confirming to IS: 15658-2006 with top layer of minimum 5 mm thickness having plan dimension 200x(160+120mm) of O.P cement smooth high gloss finish, skid resistant, manufacture from rubber moulds through vibro- compression maechanism. The compressive strength of concrete paver block shall not be less than 50 Mpa and weight 5 kg per lnluding coast of materilas, with a blanket layer of 4.00 m thick fine sand including labour, T&P etc required for proper complection of the work S.I. No. new Item 15

4094.8

970

3973184.44

... More
Cement concrete with 2 cm gauge approved stone grit coarse sand & Cement in the proporation of 4:2:1 including supply of all materilas, labour T&P etc required for proper complection of the work S.I. No. 279 a

154.56

5693

879910.08

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in lighter beam excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 285)

20.22

7128

144128.16

... More
M.S (for steel or plain) in plain work such as R.C.C or R.B work including bending for proper shape and including supply of steel & its wastage, bend hooks, and authorized overlapping shall be measured and including cost of binding wire. (As per Market rate)

106.91

6700

716297

... More
Finishing wall with two coat weather coat water proof cement paint of approved make and quality to give an even shade including supply of all materials, labour , tools & plants etc requried for proper completion of the work. S.I No Ch-15 item 662 new item

368.2

97

35715.4

... More
Brick lining on both side of the road of M-150 bricks 7 cm. wide 11 cm. deep, laid with mud mortar including labour and Supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the E/I S.I. No. 765

0.16

58118

9298.88

... More
Providing & applying Tack coat with bitumen emulsion (M/S type) using emulsion pressure distributor at the rate of 0.25 kg. per sqm on the prepared bitumenous / granular surface cleaned with machanical broom.

7675

16

125102.5

... More
Providing & laying dense graded Bitumenous Mecadam with 100-120 TPH hot mix plant producing an avearge output of 75 tonne per hour using crushed aggregates of specified grading premixed with bitumenous binder VG-30 @ 4.5% by weight to total mix and filler, transported to site laying with hydrostaic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achive the disired compaction as per MORTH & H specifications clause 507 complete in all respects

402.93

8911

3590509.23

... More
Providing & laying Bitumenous concrete with 100-120 TPH HMP producing and aver age output of 75 Tone per using crushed aggregates of specifed grading premixed with bituminous binder CRMB-55 @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver fixisher with sensor ncontrol to the required garde level and alignment rolling eith smooth whelled to the vibratory and tandem rollers to achieve the disired complection as per MORTH specification clause No. 509 Complete in all respects.

230.25

10206

2349931.5

... More
Providing & laying of Hot applied thermoplasttic compound 2.5 mm thick including Re- reflactorising glass beads @ 250 gm. Per sqm area thickness of 2.5 mm exclusive of surface applied galss beads as per IRC 35. The finished surface to be level. Uniform and fee from steaks and holes S.I. No. new item

148.4

550

81620

... More
Concrete with 4 cm. Gauge stone ballast fine sand nd cement in proportion of 12:6:1 in foundation and under floor and including supply of II material labour and T&P etc required for proper completion of the work. S.I. no 281-275+273

139.97

4475

626365.75

... More
Plain cement concrect 1:2:4 C/sand 2 cm. Stone girt including supply all materials labour T&P etc S.I No. 279-A

87.6

5693

498706.8

... More
M-150 Brick Work in 1:4 cement & Coarse sand in foundation and plinth including supply of all materials labour tools & plants etc S.I No. 305a

50.35

4643

233775.05

... More
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. (S.I. No. 584a)

1063.95

163

173743.04

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 284)

42.04

7326

307985.04

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 283)

12.6

6386

80463.6

... More
Class-150 brick work in 1:6 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. (S.I. No.303+diff. +307-306)

111.1

4163

462509.3

... More
Cast cement concrete door sills, chaukhats, boundary posts shelves and similar small work with cement, approved coarse sand and 2 cm gauge stone grit in proporation of 1:2:4 excluding its fixing and binding the same with 24 B.W G.G.I, binding wire, moulds, all materials labour, T&P etc required, for proper complection of the work. The rate excludes making of drip course which shall be paid extra. S.I. No. 282

5

6217

31085

... More
RCC work Providing and laying in position specified grade of reinforced cement concrete , including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 283)

3.3

6386

21073.8

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:2:4 in raft foundation excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 287)

23.22

5861

136092.42

... More
R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone grit in proportions of 1:1.5:3 in column excluding supply of reinforcement and its bending, but including its fixing and binding wire and including necessary centering & shuttering etc. (S.I. No. 289)

61.57

7722

475443.54

... More
P/L integral cement based water proofing treatment BIRCK KOBA including preparation of surface as required for treatment of roofs, consisting of following operations: (a) Applying a slurry coat of neat cement using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS. 2645 including adjoining walls upto 300 mm height. (b) Laying brick bats with mortar with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 over 20 mm thick layer of cement mortar of mix 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 to required slope including rounding of junctions of walls and slabs (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement : 4 coarse sand) admixed with water proofing compound conforming to IS: 2645 including laying glass fiber cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. (e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final be flooded with water for a minimum period of two weeks for curing and for final test. With average thickness of 120 mm and minimum thickness at khurra as 65 mm. (Chapter 11 new item)

188.4

940

177096

... More
M.S. Or iron work in M.S grill and stair case railling including supply of all labour & material etc. required for complition of the work S.No 502 (A)

0.95

6089

5784.55

... More
Mild steel and iron work of small size and section such as holding down Bolts, hold fasts, tierods, grating, etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of holes in door chaukhats and nosing.Fabrication of Z-Section steel windows including necessary steel fitting such as handles stay etc. (S.I. No.502 B-I)

0.7

6287

4400.9

... More
Supplying and fixing rolling shutters of approved make made of 8.25mm (3") x18 gauge cold rolled M.S. path interlocked through out their entire length and joined together at the end by end locks and mounted on specially designed pipe shaft with brick etc. side guides and arrangement for inside and out side locking with push and pull operation complete with excluding the cost of top cover and spring. (S.I. No.520 )

31.25

1584

49500

... More
Providing fixing 27.5 cm long wire spring grade two far rolling shutter S.I.No 521

10

821

8210

... More
Providing and fixing Top cover for rolling shutter 2.5 mtr wide S.I.No 522

5

940

4700

... More
Providing and fixing ball bearing rolling shutter S.I.No 523

5

891

4455

... More
Earth filling in plinth including carted earth from distance 5 km. from the site of work including watering ramming and dressing etc. in 20cm. Layers required for proper completion of the work as per direction of E/I. S.I. No. 253A+Cartage.

463

207

95841

... More
Sand filling in plinth including supply of necessary quantity of sand including watering dressing etc. for proper completion of the work S.I No-255A.

45.4

376

17070.4

... More
M-150 Brick work in 1:6 Cement Coarse sand mortar in supper structure in one brick thick wall including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 303 +Diff+ 307-306+309+310)

54.3

4599

249725.7

... More
M-150 Brick work in 1:3 Cement Coarse sand mortar in supper structure in 1/2 brick thick wall including supply of all material labour and T&P etc. required for proper completion of the work (S.I. No. 307+ 309+310A)

3

5202

15606

... More
add extra labour and material for rough face plaster of one brick wall ( S.I. No. 596)

292

19

5781.6

... More
Add extra labour for plaster in ceiling S.I. No. 587

154

19

3049.2

... More
Distempering two coat oil bound distemper of approved brand and manufactured and required shade on undecorted wall surface to given an even shade over and including priming coat with cement primer off approved brand . Such as berger J&N, Asian paint after througly brushing the suface free from mortar dropping including the surface even plaster of paris and sand papered smoothly proper completion of the work. S.I. No 649+650

458

77

35357.6

... More
Painting or varnishing work in small areas or new wood work withone coat (upto one square metre) ready mixed priming paint and 2 coat of superior quality ready mixed paint or varnish including supply of all materials. Labour tools & plants etc required for proper completion of the work paint to be used should confirm the ISI no 644+645

76

88

6695.6

... More
Providing fixing glass panes with teak wood beading in doors and windiws as desired by the E/I including cost of all materials fittings, hinges labour T&P etc required for proper completion of the work S.I. No 9.04

2.7

524

1416.69

... More
4cm thick plain cement concreet floor with 1:2:4 cement approved coarsand & stone grit laid in panels finished with 3 mm floating coat of neat cement and marble dust in ratio 5:1 as specified including supply of all material labour T&P required for proper complition of the work S.I. No. 605

226

326

73676

... More
Providing and fixing glass strips of 5mm thick & 3.5 cm deep joints of floor at the time of laying labour T&P completed S.I.No. 631-d

432

19

8553.6

... More
providing and injecting chemical for preconstruction antitermite treatment and creating and chemical barrier under and arround the column pits wall trenches basement excavation top surface in plinth filling junction of wall and floor, along the extrnal perimetre of binding expansion joints surrounding or pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per I.S. 6313 (part II 1981) aldrine emulsifiable concentrate or any other approved matrial such heptachlor of chlordane will be used. the reae of application of chemical emulsion shall be as follow:- 1- Treatment for massonary and foundation 5 liters per sqm. 2- Back fill in immediate contact with foundation 7.5 liters per Sqm. 3- treatment of surface of plinth filling 5 liters per Sqm. 4- Treatment of soil alone external perameter of building 7.5 liters per sqm 5- Treatment of soil under external paremeter 5 liters per Sqm.

173

198

34254

... More
2 cm thick plaster in dedo or skirting in 1:2 cement & C/sand including supply all materials labour T&P etc S.I No. 597.

13.5

227

3073.95

... More
Providing and fixing on wall face unplasticsed rigid PVC rain water pipes conforming to IS 13592 type A, including jointing with seal ring conforming to IS 5382 leaving 10 mm gap for thermal expansion . S.I. No. 730-A.

2.5

366

915

... More
Finishing wall with two coat water proof cement paint of approved make and quality to give an even shade including supply of all materials, labour , tools & plants etc requried for proper completion of the work. S.I No Ch-15 item 660

488.63

55

27070.1

... More
Recover of bricks

161.66

800

-129328

... More
(PART-B) The routine maintenance of above road work including earthen shoulder, bituminous pavement and 100 mm Intelrlocking paver blocks etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 1st Year maintenance cost@0.0%

1

-

-

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement and 100 mm Interlocking paver blocks etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 2nd Year maintenance cost@0.25%

1

31495

31495.24

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement and 100 mm Interlocking paver blocks etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 3rd Year maintenance cost@0.50%

1

62990

62990.48

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement and 100 mm Interlocking paver blocks etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 4th Year maintenance cost@0.75%

1

94485

94485.72

... More
The routine maintenance of above road work including earthen shoulder, bituminous pavement and 100 mm Interlocking paver blocks etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion date and ends after five years. (Including cost of materials T&P labour but excluding GST) for 5th Year maintenance cost@1.00%

1

125980

125980.96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.