The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Link Road Bhawapur School Se Uska Verma Basti Hote Hue Uska Gaw Tak Road Construction Work in Prayagraj, Uttar Pradesh, with an estimated contract value of Rs. 50,04,000. The bid opening date for this tender is 04-01-2025 and the last date for bid submission is 21-01-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Jan 2025
Closing Date21 Jan 2025
Tender Amount₹ 50,04,000
Costs
EMD
₹ 4,50,000Document Cost
₹ 8,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RKUMP_987989_1Bid Award Id
ViewTender No
537/28.12.2024Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4rd year maintenance cost @ 0.75 %
1
3978
3978.95
... More
Concrete in 1:6:12 in foundation
6
3620
21720
... More
Brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class M-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and T&P etc.complete and all taxes as per direction of E/I.
1.1
80000
88000
... More
S/F of reflective sign board,etc
1
15000
15000
... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2ND year maintenance cost @ 0.25 %
1
1326
1326.32
... More
Providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously Prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity finished to required lavel and grades to be followed by seal coat as per Techincal Specification clause 508 including cost of bitumen
3300
191
632280
... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1ST year maintenance cost @ 0.00 %
1
-
-
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 %
1
-
-
... More
GSB- Gramular Sub-Base with well Graded Material (Table 400,1) A) By Mix in Place method Contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/Tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per clause 401
495
2352
1164636
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.00 %
1
124068
124068.6
... More
M 150 class brick work in 1:4 in foundation up to plinth
10.58
5410
57237.8
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.75 %
1
31017
31017.15
... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00 %
1
5305
5305.26
... More
S/F of 350 mm dia Hume Pipe
37.5
1400
52500
... More
The routing maintenance of above road including earthen shoulder and Interlocking road etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50 %
1
2652
2652.63
... More
WBM G-2 (Inter Coat)
Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405
247.5
3120
772348.5
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.50 %
1
62034
62034.3
... More
Providing and laying of Rubber Moulded reflective Zig-Zag 80mm thick tiles of precast compressed C.C passing minimum 30mpa compressive strength ISI marked concrete block pavements having thickness 80mm as per technical specaification clause 1504
300
930
279000
... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. As per technical specification clause 502 including cost of bitumen emulsion (SS-1)
3300
36
121770
... More
WBM G-3 - Providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405
270
3220
869400
... More
The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.25 %
1
93051
93051.45
... More
Providing and applying tack coat with bitumen (VG-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Speicification Clause 503 including cost of bitumen (VG-10)
3300
19
63690