Rajya Krishi Utpadan Mandi Parishad Tender
... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Sampark Marg Ambedkar Gram Barwa Tak in Ayodhya, Uttar Pradesh, with an estimated contract value of Rs. 19,90,106. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 May 2025
Closing Date30 May 2025
Tender Amount₹ 19,90,106
Costs
EMD
₹ 2,00,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_1039246_1Bid Award Id
ViewTender No
U.N.(N.)AYO/(NIVIDA)/2025-1002 Dated 14.05.2025Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supply and laying of 80mm thick grey mccnanically compressed interlocking cement concrete paver blocks manufactured by high pressure and controlled vibration machine having minimum 5 mm thick topping of cement mixed with 20% marble powder the compressive strength of concrete paver bloks shall not be less than 30MPa & 4.50 Kg an I.S.I marked as per drawing and confirming to RC-SO-63-2004 over etc.& also including 25mm Local sand cushion below Interlocking Block as per drawing .................. required for proper completion of the work. Clause 1504 Excluding GSB ( S.No 16 page 40)
1140
950
-
... More
Laying C.C. consisting of 1:2:4 cement, course sand and approved 2 cm gauge stone ballast over prepared sub grade after its rectifications and bringing its to proper camber and including supply of all material complete in all respect
7.6
7850
-
... More
12mm thick plaster 1:4 cement and coarse sand mortar over brick work including supply of all materials, labour and T&P etc. required for proper completion of work. 155+22= 177 Diff. (S.I. (583-582)
228
177
-
... More
Earth Work in excavation in trenches for foundation and pipe, cable etc. in ordinary soil (Loan clay or sand) including lift upto 1.5M lead upto 50M and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by engineer in charge with in a lead of 50 meter. I/C Royality (SI251)
34.2
125
-
... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
112
221
-
... More
Maintenace cost of 2nd year after completion of work @ 0.25% of total work amount of item no 01 to 08
1
4853
-
... More
Maintenace cost of 3rd year after completion of work @ 0.50% of total work amount of item no 01 to 08
1
9707
-
... More
Maintenace cost of 4th year after completion of work @ 0.75% of total work amount of item no 01 to 08
1
14561
-
... More
Maintenace cost of 5th year after completion of work @ 1.00% of total work amount of item no 01 to 08
1
19415
-
Evaluation Notes How It Works ?