Rajya Krishi Utpadan Mandi Parishad Tender
... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Sampark Marg Dhushwa Marg Par Chhitauni Se Gaurkothi Marg Tak Nirman Karya in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 60,71,966. The bid opening date for this tender is 04-01-2025 and the last date for bid submission is 27-01-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender
Opening Date4 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 60,71,966
Costs
EMD
₹ 5,05,000Document Cost
₹ 10,700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_RKUMP_989393_1Bid Award Id
ViewTender No
19/2024-25Tender Authority
Rajya Krishi Utpadan Mandi Parishad ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Brick edging on both sides of the road of frist class bricks 8.0 cm (3”) wide and 12cm (4.5”) deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing, ramming excavated earth as directed by E/I. as per SI No- 765
1.6
64550
103280
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1%
1
56483
56483.41
... More
Providing, Laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity finished to required level and grades to be followed by seal coat as per technical specification clause 508 including cost of bitumin (VG-10)
4800
204
979200
... More
Providing and Applying tack coat with bitumen (VG-10) using Bitumin pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503 including cost of bitumen (VG-10)
4800
15
74400
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.0%
1
169450
169450.22
... More
S/F of 350 mm dia R.C.C Hume pipe(For Labour)
9
340
3060
... More
WBM G-3 Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required density as per technical specification clause 405
360
5110
1839780
... More
S/F of Reflective Sign Board, etc
1
15000
15000
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.0%
1
112966
112966.81
... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using machanicals means as per technical specification clause 502 including cost of bitumen emulsion(SS-1)
4800
34
167520
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.5%
1
84725
84725.11
... More
WBM G-2 (inter coat) Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required density grading -2 as per technical specification clause 405
385.2
4897
1886555.52
... More
S/F of 350 mm dia R.C.C Hume pipe (For Pipe)
22.5
1190
26775
... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements