Rajya Krishi Utpadan Mandi Parishad Tender

... More
The RKUMP has issued a formal invitation for competitive bids for the Rajya Krishi Utpadan Mandi Parishad project, for Sampark Marg Dhushwa Marg Par Chhitauni Se Gaurkothi Marg Tak Nirman Karya in Gorakhpur, Uttar Pradesh, with an estimated contract value of Rs. 60,71,966. The bid opening date for this tender is 04-01-2025 and the last date for bid submission is 27-01-2025. Interested bidders for Rajya Krishi Utpadan Mandi Parishad tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Rajya Krishi Utpadan Mandi Parishad - RKUMP Tender

Opening Date4 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 60,71,966 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Brick edging on both sides of the road of frist class bricks 8.0 cm (3”) wide and 12cm (4.5”) deep laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing, ramming excavated earth as directed by E/I. as per SI No- 765

1.6

64550

103280

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1%

1

56483

56483.41

... More
Providing, Laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity finished to required level and grades to be followed by seal coat as per technical specification clause 508 including cost of bitumin (VG-10)

4800

204

979200

... More
Providing and Applying tack coat with bitumen (VG-10) using Bitumin pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503 including cost of bitumen (VG-10)

4800

15

74400

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 3.0%

1

169450

169450.22

... More
S/F of 350 mm dia R.C.C Hume pipe(For Labour)

9

340

3060

... More
WBM G-3 Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required density as per technical specification clause 405

360

5110

1839780

... More
S/F of Reflective Sign Board, etc

1

15000

15000

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 2.0%

1

112966

112966.81

... More
Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using machanicals means as per technical specification clause 502 including cost of bitumen emulsion(SS-1)

4800

34

167520

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 1.5%

1

84725

84725.11

... More
WBM G-2 (inter coat) Providing and Laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber applying and brooming stone screening/binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required density grading -2 as per technical specification clause 405

385.2

4897

1886555.52

... More
S/F of 350 mm dia R.C.C Hume pipe (For Pipe)

22.5

1190

26775

... More
The routine maintenance of above road work including earth work repair of painted surface, earthen shoulder, and bitumenous pavement, road furniture etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost @ 0.0%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.