Purvanchal Vidyut Vitaran Nigam Limited Tender
... More
The PUVVNL has issued a formal invitation for competitive bids for the Purvanchal Vidyut Vitaran Nigam Limited project, for Construction Of Lt Line, Installation Of Acb And Distribution Box Etc. Under Eudd-bamrauli, Mayohall And Tagore Town, Prayagraj in Prayagraj, Uttar Pradesh, with an estimated contract value of Rs. 1,91,48,600. The bid opening date for this tender is 07-11-2024 and the last date for bid submission is 16-12-2024. Interested bidders for Purvanchal Vidyut Vitaran Nigam Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Opening Date7 Nov 2024
Closing Date16 Dec 2024
Tender Amount₹ 1,91,48,600
Costs
EMD
₹ 1,91,486Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PVVNV_971490_1Bid Award Id
ViewTender No
16/EUDC-II/PYG/SE/2024-25Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-Website
http://http://puvvnl.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Errection & Commissioning of (3x120+1x195+1x16)/ (3x95+1x70+1x16) sq.mm LT AB cable, ( dead end clamp, suspension clamp, PG clamp ,I Hook with clamp, Nut bolt , PRC Connector etc will be arranged by the contractor at his own cost)
30120
-
-
... More
Painting of ST POLE (Aluminum paint, Red oxide paint etc will be arranged by the contractor at his own cost)
66
-
-
... More
Errection & Commissioning of ACB 3P 415V, 400Am to improve LT fuse protection system , Making foundation size as pr required, stepping , plastering the same with cement sand in raio 1:6 & Fixing the structure for ABC.( ACB 3P 415V, 400Am,material related civil work,structure for ABC etc will be arranged by the contractor at his won cost.)
90
-
-
... More
Laying of double 3.5*400/240/150 sq mm LT XLPE cable normal soil by digging of trench 900 mm deep, 600 mm wide at diffrent site. The enter axial spacing between two cable. The cable shall be laid between two continuous rows of bricks, river sand packing on all side of cable shall be done. After laying down of the cable the stone slab shall be laid in such a manner so that cable channel is completely covered from top. The cable shall be laid strictly in compliance to RESSPO Norms and Electrical safety rules ( GI pipe,nut bolt ,Holding clamp, HDPE pipe, bricks, sand, Al. lug, LT jointing kit etc will be arranged by the contractor at his own cost)
8272
-
-
... More
Fixing of TPMO switch at existing DP ,opening all type connection & reconnection during work(U bolt, clamp, nut & bolt, channel etc will be arranged by the contractor at his own cost)
60
-
-
... More
Earthing of PCC/ST pole complete with the help of M.S. rod 16 mm dia and 2.5 mtr. long, fastening of G.I. wire with clamps/X-arm/support to M.S. earth rod. (All decentralized material G.I. strip ,nut bolt and clamp will be arranged by the contractor at his own cost)
68
-
-
... More
Errection & Commissioning of 3 Phase LT distribution boxes on the LT PCC/ST poles , connections & sealing its, connection between Distribution Box & AB cable by 1x35 sq. mm LT PVC cable (Distribution box, clamp, LT PVC Cable, PRC Connector, Nut & Bolt with washer etc will be arranged by the contractor at his own cost)
1012
-
-
... More
Spreading and stringing of 3 Phase 4 wire continuous ACSR Dog conductor for LT line line including binding of insulator complete in all respect. The work includes jumpering/connecting of conductor at sectional pole. The work also includes opening of O/H cable service line and its connection after sagging the conductors as per Resspo and Electrical Safety rule.(nut bolt ,Holding clamp, Al. binding wire cycle strip,shaickle insulator etc will be arranged by the contractor at his own cost)
110
-
-
... More
Details of Works
-
-
-
... More
3 ½ 400/240 /150 OR 1*400/240/150sq. mm.
6000
-
-
... More
Errection, of single support 9MTR ST pole for LT line, including fixing of necessary clamps (stone pad,Danger board with clamp ,Holding clamp, I Hook with clamp, nut bolt & washer will be arranged by the contractor at his own cost)
66
-
-
... More
Earthing of T/F Body, Neutral and Metering Cubical Complete by 40 mm dia 2.5 Mtr. Long G.I. pipe electrodes by digging 3 Mtr. deep pits , making alternate layer of salt & charcoal and connecting with GI Strip of size 25x6 mm with clamps, Testing of earthing as pr rule ofter complete this work result will be satisfactory then connect all connection properly (All material related this work will be arranged by the contractor at his own cost) NOTE - Attached technical specification & photo
40
-
-
... More
Spreading and stringing of single wire continuous ACSR Dog /Weasel conductor for LT Neutral line including binding of insulator complete in all respect. The work includes jumpering/connecting of conductor at sectional pole. The work also includes opening of O/H cable service line and its connection after sagging the conductors as per Resspo and Electrical Safety rule.( nut bolt ,Holding clamp, Al. binding wire including ,insulator will be arranged by the contractor at his won cost. )
18050
-
-
... More
Errection, of single support 8.5MTR PCC pole for LT line, including fixing of necessary clamps (Stone pad ,Holding clamp, I Hook with clamp, nut bolt & washer will be arranged by the contractor at his own cost)
267
-
-
... More
Grouting & Plinthing of PCC/ST pole. Grouting ratio 1:4:8, Cement, Stone Grit & Coarse Sand (all grouting material will be arranged by the contractor at his own cost
333
-
-
... More
Errection & Commissioning /replace of MMCB to improve LT fuse protection system , Making foundation size as pr required, stepping , plastering the same with cement sand in raio 1:6 & Fixing the structure for ABC.( MMCB, material related civil work, structure for MMCB etc will be arranged by the contractor at his won cost.)
32
-
-