Purvanchal Vidyut Vitaran Nigam Limited Tender
... More
The PUVVNL has issued a formal invitation for competitive bids for the Purvanchal Vidyut Vitaran Nigam Limited project, for Construction Of Independent 33 Kv Line (by Tower) Under Edd Ballia Nagar For Jal Jeevan Mission Under Full Deposit Scheme On Turnkey Basis in Ballia, Uttar Pradesh. The bid opening date for this tender is 21-03-2025 and the last date for bid submission is 04-04-2025. Interested bidders for Purvanchal Vidyut Vitaran Nigam Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Purvanchal Vidyut Vitaran Nigam Limited - PUVVNL Tender
Opening Date21 Mar 2025
Closing Date4 Apr 2025
Tender AmountRefer Documents
Costs
EMD
₹ 28,500Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PVVNV_1020615_1Bid Award Id
ViewTender No
45/EDC(B)/2024-25Tender Authority
Purvanchal Vidyut Vitaran Nigam Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Laying, stringing, tensioning clamping, jointing etc of ACSR 'Panther' conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting Armour rods, vibration dampers etc, on all Three phases of 132 KV DC Lines
0.33
-
-
... More
Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers
-
-
-
... More
120 KN Porcelain Insulator
130
-
-
... More
Erection of superstructure of 132KV DC Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger numer, phase plates, bird guard and fixing & punching for 132 KV SC/DC lines
16.55
-
-
... More
PHASE PLATE Set of red,blue and yellow
2
-
-
... More
Cost of excavation of 132 KV tower foundation pits including all earth work, backfilling levelling etc
393.6
-
-
... More
ACSR Panther
1.5
-
-
... More
Surevy including preparation of schedule of materials, marking of locations (Route Length), GPS survey of line with co-ordinates of each tower (The length of line shall be aouthenticated by GPS survey)
0.33
-
-
... More
Earth wire Damper
2
-
-
... More
DANGER PLATE
2
-
-
... More
Soil investigation (All kind of Soil)
2
-
-
... More
Grounding work including earthwork etc for Pipe type grounding including cost of coke & salt
2
-
-
... More
Coper Bond
2
-
-
... More
Hot dip galvanized, Hexagon round hexagon head transmission tower bolts nuts and washers for above structures as per BOM including step bolts & spring washers
0.25
-
-
... More
Supply Of Towers ,Conductor & All ACCESSORIES
-
-
-
... More
Laying, stringing, tensioning clamping, jointing etc of 7/2.25 mm GS Earth Wire including , fitting of all necessary hardware and accessories i.e. fitting , vibration dampers etc,
0.33
-
-
... More
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground levvel whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of Zinc rich Aluminium paint of the affected surface including cost of all material including tack welding of river crossing tower & Anchor towers.
1000
-
-
... More
7/2.25mm GS Earth wire
0.4
-
-
... More
ERECTION WORK
-
-
-
... More
Check Survey
0.33
-
-
... More
Earth wire Tenstion Fitting
2
-
-
... More
EARTHING MATERIAL
2
-
-
... More
Cost of concreting of all type of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curring but excluding cost of reinforcement bars
-
-
-
... More
Mild Steel
16.55
-
-
... More
VIBRATION DAMPER
6
-
-
... More
SINGLE TENSION FTTG.
8
-
-
... More
132 KV DC Panther.
2
-
-
... More
1:2:4 concreting.
90
-
-
... More
Installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting bending placing dinding etc.
0.38
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements