Public Works Department Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date4 Apr 2025
Closing Date10 Apr 2025
Tender Amount₹ 39,00,000
Costs
EMD
₹ 3,90,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEMRT_1025158_15Bid Award Id
ViewTender No
611/96M/Etender Date 22-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply & fixing of NP-3 class 450 mm dia RCC hume pipe (ISI mark) of following diameters including carriage, loading, unloading at site also including cost of hume pipes & collars & all taxes including laying in proper position & joint filling including cost of necessary jute & cement for proper complete in all respects but excluding GST.
15
2000
30000
... More
Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. as per direction of Engg-in-Charge
1860
15
27900
... More
Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M and lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches (SI No. 251 (a)
200
90
18000
... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per Technical Specification Clause 502
1860
33
61380
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per Technical Specification Clause 508. as per direction of Engg-in-Charge
1860
156
290160
... More
Construction of un-reinforced, without dowel jointed at expansion and construction joint, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days. using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
180
7500
1350000
... More
Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SI . 281 (b)
40
4850
194000
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
80
170
13600
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. as per direction of Engg-in-Charge (G-2)
139
2250
312750
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 as per direction of Engg-in-charge
1860
60
111600
... More
Earth work in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m in depth and earth work in embankment to be in 20 cm layers of patries including remming and dressing the surface to required levels and slopes and including 1.50 M lift and 30 M lead also including machinacally compaction to achieve 95% proctors density including arrangement of water, settlement and all T&P charges including roller and its fues. The earth from cuttiing to be used in making embankment are to be carted earth lead 30 m. distance in Abadi Portion as directed by engineer-in charge. For patries work. (Including all taxes but excluding GST.) Si No 253
248
78
19344
... More
Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge.
0.62
58700
36394
... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
54
6450
348300