Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Ganeshpur Dandoopur Ghamahapur Sampark Marg Ka Nav Nirman Ka Karya in Varanasi, Uttar Pradesh, with an estimated contract value of Rs. 98,00,000. The bid opening date for this tender is 10-11-2026 and the last date for bid submission is 17-11-2026. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender - UP Tender

Opening Date10 Nov 2026
Closing Soon17 Nov 2026
Tender Amount₹ 98,00,000 
Notes
Download

Costs

Description

Ganeshpur Dandoopur Ghamahapur Sampark Marg Ka Nav Nirman Ka Karya

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Water Bound Macadam Sub-base/base / (3) WBM Grading 3 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means (Including all Taxes & Laboure cess but Excluding GST)

352.5

3240

1142100

... More
Cement Concrete Pavement - Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Including all Taxes & Laboure cess but Excluding GST)

750

8280

6210000

... More
Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. / Rate as per item No.11.1 of Chapter 11 / Rate as applicable for the type of soil/rock are to be taken(Including all Taxes & Laboure cess but Excluding GST)

32.46

355

11523.3

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / 600 mm dia(Including all Taxes & Laboure cess but Excluding GST)

7.5

3700

27750

... More
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 / Rate as per item No.11.4 of Chapter 11(Including all Taxes & Laboure cess but Excluding GST)

5.56

5950

33082

... More
Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11(Including all Taxes & Laboure cess but Excluding GST)

18.41

5940

109355.4

... More
Pointing with Cement Mortar (1:3) on brickwork as per technical specification Clause 613.3 / Rate as per item No.12.2 of Chapter 12(Including all Taxes & Laboure cess but Excluding GST)

35.88

96

3466.01

... More
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in Single Row/Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106./(G) 350 mm Dia(Including all Taxes & Laboure cess but Excluding GST)

15

1650

24750

... More
Maintainance cost :- Maintainance cost will be paid year wise as per prevailing Government order No. 17/2024/SA-113/23-1-2024-23-1099/113/2023 date 16.01.2024.Maintainance cost will adjusted as per final cost of constrction and will be paid accordingly

1

-

-

... More
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

-

-

... More
2nd year - maintainance cost 0.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

23543

23543.33

... More
3rd year - maintainance cost 0.50% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

47086

47086.66

... More
4th year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

70630

70630

... More
5th year - maintainance cost 1% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.

1

94173

94173.33



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.