Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Widening And Strengthening Work Of The Masodha-suchittaganj Road (from The Canal Bridge At Munsi Ka Purwa To The Satti Chaura Police Point On Nh-27) (odr) In Ayodhya District From Chainage 16.100 To 36.530, To A Two-lane Configuration in Ayodhya, Uttar Pradesh, with an estimated contract value of Rs. 72,65,00,000. The bid opening date for this tender is 21-10-2026 and the last date for bid submission is 17-11-2026. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender - UP Tender
Opening Date21 Oct 2026
Closing Soon17 Nov 2026
Tender Amount₹ 72,65,00,000
Costs
EMD
₹ 72,65,000Document Cost
₹ 2,714Tender Fee
Refer Documents
Description
Widening And Strengthening Work Of The Masodha-suchittaganj Road (from The Canal Bridge At Munsi Ka Purwa To The Satti Chaura Police Point On Nh-27) (odr) In Ayodhya District From Chainage 16.100 To 36.530, To A Two-lane Configuration
AI Insights
Unlock AI Insights for this Tender
Sign in to request AI-powered insights, eligibility criteria and automated analysis for this tender.
Contact
Tender Id
2026_CEUFZ_1199193_1Tender No
6401/02kamayoambecircle/2026 dt. 09.10.2026Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and above backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size 300mm and above 600 mm to 900 mm
870
-
-
... More
Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and above backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size 300mm and above 900 mm to 1800 mm
820
-
-
... More
Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and above backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size 300mm and above Above 1800 mm
170
-
-
... More
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
18077
-
-
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
442878
-
-
... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
31820.27
-
-
... More
GSB Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
19781
-
-
... More
WMM Providing, laying, spreading and compacting graded stone aggregate in layers Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
15754.75
-
-
... More
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.
139995
-
-
... More
Providing, laying and spreading Material on a prepared sub base, Cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of Sub Base / Base.
26800
-
-
... More
Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
15110
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
225
-
-
... More
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
5889.85
-
-
... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
207
-
-
... More
Construction of un-reinforced, dowel jointed, plain Cement Concrete Pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing km 119.200 to 121.000
207
-
-
... More
Earth-work Excavation in trenches for foundations pipes, cable etc,(Loan clay or sand) including lift upto 1.5m lead upto 50m. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within ahead of 30m.(For construction of structure,culverts & extention of culverts,)
3641.96
-
-
... More
Providing and laying P.C.C M-15 grade Cement concrete Stone aggregate 40mm nominal size) and curing complete,including cost fo formwork in foundation and floors.(For construction of structure,culverts & extention of culverts,)
696.69
-
-
... More
Class-150 brick work in 1:3 Cement and Coarse sand of mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.(For construction of structure,culverts & extention of culverts,)
472.29
-
-
... More
Class-150 brick work in 1:3 Cement and Coarse sand of mortar in sub-structure including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.(For construction of structure,culverts & extention of culverts,)
515.4
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M30 using batching plant transit mixer & Concrete pump.(For construction of structure,culverts & extention of culverts,)
1260.18
-
-
... More
Mild steel or iron in plan work such as reinforced concrete or reinforced brick work(When not included in an overall rates). Wrought to required shape as necessary including bending for proper completionof the work and including supply of steel its wastage bend hooks and authorised ovelapping shall be measured upto floor two level.(For construction of structure,culverts & extention of culverts,)
136
-
-
... More
Supplying and laying one layer of tar felt or any other equivalent approved material at the junction of wall and roof of any place an roof as per direction of E/I including necessaryoverlap, giving a coat of approved mastic paint belowthe Tar felt and including supply of all materials , labour and tools and plants etc.Required for propercompletion of work fix as per standard.(For construction of structure,culverts & extention of culverts,)
61.75
-
-
... More
Supply and fixing of 110cm internal Dia Ac Down pipes required for proper completion of work in weep holes.(For construction of structure,culverts & extention of culverts,)
144
-
-
... More
Struck Pointing on brick work with cement mortar 1:3 (1Cement :3 sand)(For construction of structure,culverts & extention of culverts,)
561.6
-
-
... More
15 mm thick Plaster work in 1 :3 cement coarse sand mortor including all labour materials T & P etc complete.
11.42
-
-
... More
Back filling behind abutment, wing wall and retaining wall complete as per drawing and technical specification clause 1204.3.8 of MORD specification.(For construction of structure,culverts & extention of culverts,)
128.79
-
-
... More
Providing and laying of 900 mm Hume pipe i/c all taxes and cartage etc.
20
-
-
... More
Providing and laying of 600 mm Hume pipe i/c all taxes and cartage etc.
30
-
-
... More
Providing and laying of 350 mm Hume pipe i/c all taxes and cartage etc.(For construction of structure,culverts & extention of culverts,)
190
-
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
3075
-
-
... More
Providing and laying pitching on slope laid over prepaired fiter media including boulder appron laid dry in front of toe of imbankment complete as per drawing and tech. specification.(For construction of structure,culverts & extention of culverts,)
6150
-
-
... More
Type-B, "THRIE" Metal Beam Crash Barrier. Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 811
15250
-
-
... More
For Brick Soling along the road sholder protection part
7200
-
-
... More
Providing and laying of hot applied thermoplastic compound 2.50 mm thick in 100mm widh including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35. The finished Surface to be level, uniform and free from streaks and holes.
5601.5
-
-
... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 4 mm thick supported on a mild steel angle iron post 35 mm x 35 mm x 3 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. 60x40 Rectangular
16
-
-
... More
Supply fixing & erection of built up cantilever structure 6.00M Span comprising of one vertical posts of 6.00 M high made up of 300 mm N.B. havi Class M.S. Pipe as vertical member welded with 10mm thick M.S. Plate at top & 12mm plate at bottom. the horizontal truss shall comprise of 50mm dia havy class M.S. pipe and 40mm dia heavy M.S. pipe as bracing & 10 mm M.S. plate bottom for fixing to vertical post as per structure desing & drawing with one of sttel primer and two coats of synthetic enamel plant. the work i/c construction of RCC foundation of size 90Mx90M of required depth as per site condition for built up structure i/c earth work in excavation 100 mm thick lean concrete in 1:4:8 cement sand and 40mm gauge stone ballast. RCC withand 1:2:4 cement coarse sand and 20mm stone grit i/c supply and fixing of 25mm dia foundation bolts 600 mm long as per provision of structure design i/c cost of renforcement & shuttering. as per direction of Engineer in charge.
2
-
-
... More
Supply and fixing rectro reflective sign board made up with 4mm thick aluminium composite panel (ACP) face full coverd with high intesity prismatic retro reflective sheeting of approved specification as per M.O.R.T & H having approved message fully processed on by pressure sensitve equipment banc of ACP with frame of 35x35x4mm angle iron all round and cross with proper clamping arrangement to be fixed in structure. the back of the ACP sheet shall be enamel coated. as per direction of Engineer in charge.
43.92
-
-
... More
VILLAGE/HOSPITAL/SCHOOL SIGN BOARD Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 4 mm thick supported on a mild steel angle iron post 35 mm x 35 mm x 3 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. 60X60 cm Circular
40
-
-
... More
REPEATED BAR Providing and laying of hot applied thermoplastic compound 5mm thick including reflectorising glass beads @ 500 gms per sqm area, thickness of 5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
214.2
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 1st year maintenance cost @ 0.00%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 2nd year maintenance cost @ 0.25%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 3rd year maintenance cost @ 0.50%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 4th year maintenance cost @ 0.75%.
1
-
-
... More
The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 5th year maintenance cost @ 1.0%.
1
-
-