Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Construction Of Sainiya Unji To Sirsiya Link Road in Basti, Uttar Pradesh, with an estimated contract value of Rs. 23,87,000. The bid opening date for this tender is 24-03-2025 and the last date for bid submission is 29-03-2025. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date24 Mar 2025
Closing Date29 Mar 2025
Tender Amount₹ 23,87,000
Costs
EMD
₹ 2,39,000Document Cost
₹ 944Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUBZ_1006568_4Bid Award Id
ViewTender No
345/A-2 DATED-27-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not not exceding 0.50 mt. in depth and work in embankmet to be n 20 cm. layers includding ramming and dressing the surface to required level and slope and also including 1.5 mt. lift and 30 mt. lead as per SL. No.253 detailed specification & direction of E/I. for Embankment work.
1100
105
115500
... More
Class 150 A brick work in 1:3 cement and coarse sand in super structure As per S.I.No. 307
1.26
5440
6854.4
... More
Concrete with 40 mm gauge brick ballast, fine sand of 1.25 F.M. and cement in the proportion of 6:3:1 as per S.I. No. 280
3.88
6550
25414
... More
Class 150 A brick work in 1:3 cement and fine sand mortar As per S.I.No. 306
2.61
5150
13441.5
... More
CEMENT TREATED BASE WBM Grade-III Providing, laying and spreading Material on a prepared sub base, adding cement @ 4% by weight to the spread material manually, mixing in place with rotavator and compacting with the Road roller at OMC to achieve the desired unconifined compressive strength and to form a layer of base.
132
4693
619476
... More
NP3 Hume Pipe Culvert 600 mm Dia- 1 No. Earth work in excavation in foundation as per S.I. No. 251
23.35
120
2802
... More
Cost of Vth Year Maintinance @3.00%
69734
1
69734
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type C as per Technical Specification Clause 508.(Including cost of Bitumen)
1762.5
200
352500
... More
Cost of IIIrd Year Maintinance @1.50%
34867
1
34867
... More
Construction of granular sub-base by providing Shankargarh material, spreading in uniform layers with motor grader on prepared surface and compacting in two layers at OMC with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
273
3538
965874
... More
Struck pointing with 1:2 cement and fine sand. As per SI. NO. 574
16.49
190
3133.1
... More
Cost of IVthYear Maintinance @2.25%
52300
1
52300
... More
Providing and applying tack coat with Bitumen (VG-10) at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer complete as per Technical Specification Clause 503.(Including cost of Bitumen)
1762.5
15
26437.5
... More
Earth work in patries with ordinary soil (loam,clay and sand) excavation to be in the form of regular pits not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers including the ramming and dressing the surface to required levels, slopes and also including 1.5 m lift and 30 m lead the earth form cutting to be used in making embankment or to be deposited as spoil bank within 30 m distance as directed by the Engineer-In-Charge including mechanically compaction without royalty as per ( S.I. No. 253) in
330
105
34650
... More
Supply of 600 mm dia Hume Pipe NP-3 type
7.5
2665
19987.5
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C, as per Technical Specification Clause 510. (Including cost of Bitumen)
1762.5
70
123375
... More
Earth work in ordinary soil. As per SI. No. 253
46.25
105
4856.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements