The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for 11 Re-construction Work In Chini Mill Alipur Kurd (tirpadi) Budhana Khurd Road. in Muzaffarnagar, Uttar Pradesh, with an estimated contract value of Rs. 57,36,000. The bid opening date for this tender is 30-11-2024 and the last date for bid submission is 06-12-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date30 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 57,36,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete with 4 cm gauge in proportions of 8:4:1 stone Ballast, Coarse sand and cement including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. As per SI No. 281

28.6

-

138710

... More
12 mm thick plaster with with 1:4 cement and Corse sand over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. As per SI No. 584 A

499

-

82335

... More
Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 A. By Manual Means Case - III : Type C (I) Bitumen (S-90)

1800

-

106200

... More
Construction of un-reinforced, without dowel jointed at expansion and construction joint, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other typ0e as per clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints, aplying debonding strips, prime, sealant, near approaches to bridge, culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days.

315

-

2362500

... More
(a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches. (where machine can not move ) As per SI No. 251

103

-

9270

... More
(a) Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. As per SI No. 253

975

-

76050

... More
R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2;4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. As per SI No. 283

29

-

187050

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam Steblized with 3.5% Emulsiong + 1% Cement Specification including premixing the material with water at OMC in mechanical mixer plant, carriage of mixe material by tipper to site, laying in uniform layers in subbase/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Table 400.11& 400.12 and Technical Specification Clause 406. of MORD. I/c all taxes, labour cess, levy, toll fee roylaty, contractor Profit but excluding GST.

180

-

1213200

... More
(B) M-150 Brick Work in 1:3 (One cement & three coarse sand) mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work As per SI No. 307

27

-

128655

... More
M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.

840

-

378000

... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Case - I By Manual Means (I) Bitumen (S-90)

1800

-

279000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.