If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Feb 2025
Closing Date24 Feb 2025
Tender Amount₹ 25,50,000
Costs
EMD
₹ 2,55,000Document Cost
₹ 944Tender Fee
Refer Documents
Summary
Construction Of Bdb Km 9 To Pankarpur Link Road (including 5 Year Maintenance Cost)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CEUAZ_1004672_6Bid Award Id
ViewTender No
262/4A DATED 06/02/2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and applying prime coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502. (excluding GST)
1860
36
-
... More
W.B.M (Grade-3) Providing, laying, spreading and compacting stone aggregates of specific sizes 53mm to 22.4mm to water bound macadam (G-3) specification including spreading in uniform loose thickness hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, Stone dust to fill-up the interstices of coarse aggregate, watering and compacting 7.50cm thickness to the required density Grading 3 as per Technical Specification Clause 405. (excluding GST)
139.5
4130
-
... More
Construction of Embankment with approved material obtain from Borrow pits with all lift and lead, transporting to site ,spreding grading to required slope and compacting to meet requirement of Table-300-2. (excluding GST)
1400
85
-
... More
Maintenance of 2nd year after completion of work @0.75% of total work amount of item 1 to 11
1
17715
-
... More
Maintenance of 5th year after completion of work @3.00% of total work amount of item 1 to 11
1
70861
-
... More
By Mix in Place Method (for GSB Grading-1 material)
Construction of granular sub-base (Grade-1 G.S.B.) by providing well graded material, spreading in uniform layers @1.28 times the specified compacted thicknes with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (excluding GST)
125
3500
-
... More
Maintenance of 4th year after completion of work @2.25% of total work amount of item 1 to 11
1
53146
-
... More
Providing and laying seal coat sealing 6.7mm stone grit @0.009 cum per sqm the voids in a bituminous grade VG-10 @0.65kg per sqm surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. (excluding GST)
1860
70
-
... More
W.B.M (Grade-2)
Providing, laying, spreading and compacting stone aggregates of specific sizes 45-63mm to water bound macadam (G-2) specification including spreading in uniform thickness hand packing, rolling with three wheel 80-100 KN static roller in stages to proper grade and camber, applying and brooming Stone dust to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading-2 as per Technical Specification Clause 405. (excluding GST)
139.5
4000
-
... More
Construction of Embankment with approved material obtain from Borrow pits with all lift and lead, transporting to site ,spreding grading to required slope and compacting to meet requirement of Table-300-2. (in patri work) (excluding GST)
250
85
-
... More
Maintenance of bituminous surface road and gravel or WBM road including filling pot holes and patch repair etc., restoration of rain cuts and dressing of side slop /berms, making up of berms/ shoulders, maintenance of drain, maintenance of culvert, maintenance of guard rails and parapet, maintenance of road signs, speed breakers, standing tree at adjacent to road wherever required, maintenance of Hectometer and kilometer stone cutting of branches of tree, shrub and trimming of grass and weeds etc. white washing of parapet including CD work, painting of guard stone, refixing of displaced guard stone. as per GO No. 55/2022/187/23-9-2022-02 Nabard/2021 Dt. 28.04.2022 Maintenance of 1st year after completion of work @0% of total work amount of item 1 to 11
1
-
-
... More
Maintenance of 3rd year after completion of work @1.50% of total work amount of item 1 to 11
1
35431
-
... More
Providing & Fixing of Sign Board, Km Stone, Hectometer Stone includign painting and lettering etc. complete (excluding GST)
1
10000
-