Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 44,75,000
Costs
EMD
₹ 4,24,000Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMBD_986807_1Bid Award Id
ViewTender No
7845/Tender-MBD Circle/2024-25 Dt. 17-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Excluding cost of GST
5040
70
352800
... More
Construction of sub grade and earthern shoulders with approved material obtained from borrow pits with all lifts and leads transporting to sites, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1 Excluding cost of GST
600
95
57000
... More
Construction of un-reinforced plain cement concrete pavement, 15 cm thickness as per design over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 Grade coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side frame work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the framework as per drawing), spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints by providing 12mm thick dura board at the specified spacing, applying debonding strips primer, sealant near approaches to bridge/culvert and construction joints admixtures as approved, curing of concrete slabs for 14-days and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 but including cost of polythene sheet . Excluding cost of GST
144
7950
1144800
... More
Excavation in fundation in ordinary soil ( Loam,clau or sand ) including lift upto 1.5M and lead upto 30M and including filling wetering and ramming of excavated earth into the trenches of into the space between the bulding and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as the directed by the Engineer-in-charge upto a distance of 30M from the foundation trenches.( Where machine can not reach/move).For Building work only.(SI No-251 Excluding cost of GST
210
110
23100
... More
Cement Concrete with 4cm Guage Stone ballast conarse sand and cement concrete in proportion of 1:4:8 including supply of all meterials labour and T&P etc. requried for proper competion of the work. (SI no - 281) Excluding cost of GST
42
5750
241500
... More
R.C.C Work with cement approved coarse sand and 2cm gauge approved stone grit in proportion of 1:2:4 in lintels of doors. Windows and sunshades excluding supply of reingrorcment and its bending but including itr fixing and binding the same with 24 B.W.G.I binding wire and including necessary centering and suttering etc. and supply of all meterials. labour and T&P etc requried for proper completion of the work Binding wire to be supplied by the contractor free of cost including making of drip coarse.(SI No-283) Excluding cost of GST
81
7500
607500
... More
Mild steel or iron in plain work such as reinforcment concrete or reinfocmend brick work ( when not including in an over all rates) wrought to requried shade as necessary including bending for proper completion of the work and including supply of all steel.(SI No 504) Excluding cost of GST
44
8200
360800
... More
Maintenance of constructed road next five year after completion the contractor shall be paid total maintenance cost 15% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including cess and Excluding GST)
For 1st Year 0.00%
1
-
-
... More
Item No. 13 but for 2nd year 1.50%
0.02
-
-
... More
Item No. 13 but for 3rd year 3.00%
0.03
-
-
... More
Item No. 13 but for 4th year 4.50%
0.05
-
-
... More
Item No. 13 but for 5th year 6.00%
0.06
-
-
... More
Maintenance of constructed road next five year after completion the contractor shall be paid total maintenance cost 2.5% of tender Civil Cost for five year in the form of instalment as below. The payment shall be inclusive of cess but excluding GST payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor (Including All Taxes but Excluding cost of GST.)
For 1st Year 0.00%
1
-
-
... More
Item No. 14 but for 2nd year 0.25%
-
-
-
... More
Item No. 14 but for 3rd year 0.50%
0.01
-
-
... More
Item No. 14 but for 4th year 0.75%
0.01
-
-
... More
Item No. 14 but for 5th year 1.00%
0.01
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements