Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for 3 Repair Work Of Non Residential Building In Tehsil Kairana In Distt Shamli In Fy 2024-25 in Shamli, Uttar Pradesh, with an estimated contract value of Rs. 2,30,000. The bid opening date for this tender is 28-11-2024 and the last date for bid submission is 04-12-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date28 Nov 2024
Closing Date4 Dec 2024
Tender Amount₹ 2,30,000
Costs
EMD
₹ 23,000Document Cost
₹ 767Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRT_978238_3Bid Award Id
ViewTender No
2058/8A DT 12.11.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:3 over brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work.S.I.NO 582 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
79
170
13430
... More
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. required for proper completion of the work. S.I.NO (660+661) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
547
83
45401
... More
Distempering (first coat) with oil bound distemper of approved brand and manufacture and of required shade on undecorated wall surface to give an even shade over and including a priming coat with cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paint after thoroughly brushing the surface free from mortar dropping and other foreign matters and also including the surface even with plaster of Paris or approved synthetic materials and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(649+650) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
565
78
44070
... More
Supply and fixing 6 mm. (¼") China white glazed tiles in flooring or in skirting or dado laid with 1:3 Cement and approved coarse sand mortar finished with white cement slurry, jointing and polishing complete, including supply of all materials, labour and Tools and Plants. S.I.NO 628 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
94
900
84600
... More
2 cm thick Damp Proof Course with Cement and approved coarse sand 1:2 with and including water proofing compound (1 Ltr. to 1 bag of cement of 50 Kg.) as ordered by the Engineer incharge in the proportion as specified by the manufacturer including supply of all materials, labour, Tools & plants etc. required for proper completion of the work and including proper curing & shutterings as necessary. S.I.NO 360 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST.
10
235
2350
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements