Public Works Department Tender
... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Renewal Of Audi Devrilla Road To Rampur Link Road With 5 Years Maintenance in Mirzapur, Uttar Pradesh, with an estimated contract value of Rs. 14,70,202. The bid opening date for this tender is 14-12-2024 and the last date for bid submission is 27-12-2024. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Public Works Department - PWD Tender
Opening Date14 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 14,70,202.5 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,55,000Document Cost
₹ 950Tender Fee
Refer Documents
Summary
Renewal Of Audi Devrilla Road To Rampur Link Road With 5 Years Maintenance
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEMRZ_983535_2Bid Award Id
ViewTender No
2367/2A Date 27-11-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
The routine maintenance of above road work Including ebankment.patrie pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1 year maintenance cost (0%)
3.1
-
-
... More
Providing and applying tack coat with Bitumen VG-10 grade @ 0.30 kg per sqm on the prepared bituminous surface cleaned with as per Technical Specification Clause 503.
5437.5
13
70687.5
... More
Providing, laying, spreading and compacting stone aggregates of 53 to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN capacity in stages to proper grade and camber, applying and booming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density (Grading 3) as per MORD Specification Clause 405.
86
2490
214140
... More
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm Dala grit using bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN capacity static roller, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508.
5437.5
160
870000
... More
The routine maintenance of above road work including embankment,patrie, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (3% of Construction Cost)
3.1
-
-
... More
The routine maintenance of above road work Including embankment.patrie, pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (2% of Construction Cost)
3.1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements