Public Works Department Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 31,28,00,000 
Notes
Download

Costs

Summary

Widening And Strengthening Of Moradabad-haridwar-dehradun (sh-49) Road From

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 including all labour, material, T&P etc complete but excluding GST.

3435.82

-

-

... More
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(Lead upto 2.00 Km) including all labour, material, T&P etc complete but excluding GST.

12902.85

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including all labour, material, T&P etc complete but excluding GST.

4394

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Lead upto 2.00 Km) including all labour, material, T&P etc complete but excluding GST.

2626

-

-

... More
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. including all labour, material, T&P etc complete but excluding GST.

12407.85

-

-

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including all labour, material, T&P etc complete but excluding GST.

8835.48

-

-

... More
Providing, laying, spreading of graded stone aggregate (Stablized WMM) after making with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.5% emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density. including all labour, material, T&P etc complete but excluding GST.

4908.6

-

-

... More
Providing and applying tack coat with bitumen VG-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. including all labour, material, T&P etc complete but excluding GST.

231795

-

-

... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. including all labour, material, T&P etc complete but excluding GST.

6797.25

-

-

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including all labour, material, T&P etc complete but excluding GST.

5454

-

-

... More
Culverts & Drain

-

-

-

... More
Excavation in foundation in ordinary soil (loam clay and sand) including lift upto 1.50 M and lead upto 30M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the side of foundation, including cost of material, labour, Royalty, labour cess, T&P etc and other taxes but excluding GST.

3131.13

-

-

... More
Cement Concrete with 4 cm gauge with Stone Ballast coarse sand & Cement in proportion 8:4:1 in foundation proper completion of the work including cost of material, labour, Royalty, labour cess, T&P etc and other taxes but excluding GST S.I. No. 281

462.59

-

-

... More
M-150 brick work in One cement and Three course sand mortar in foundation and plinth proper completion of work Including cost of all materials, labour, T&P etc. and also including labour cess, royalty and all other taxes. But excluding GST SI.No. 307

1024.32

-

-

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work including supply of all materials labour and completion of work. Including all taxes but excluding GST S.I.No. 574

1124.27

-

-

... More
Cement Concrete with 2 cm gauge stone grit / single course sand and cement in proportion of 4:2:1 including supply of all material labour & T&P etc. required for proper completion of the work including cost of material, labour, Royalty, labour cess, T&P etc and other taxes complete but excluding GST SI.No. 279 (a)

2.16

-

-

... More
Supply and laying of NP-3 1000mm dia Hume pipe including cost of material, labour, Royalty, labour cess, T&P etc complete but excluding GST.

175

-

-

... More
Supply and laying of NP-3 600mm dia Hume pipe including cost of material, labour, Royalty, labour cess, T&P etc complete but excluding GST.

30

-

-

... More
Supply and laying of NP-3 900mm dia Hume pipe including cost of material, labour, Royalty, labour cess, T&P etc complete but excluding GST.

20

-

-

... More
Supply and laying of NP-3 350mm dia Hume pipe including cost of material, labour, Royalty, labour cess, T&P etc complete but excluding GST.

40

-

-

... More
R.C.C. Work with cement, approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in RCC Culvert/Drains etc excluding supply of reinforcement but including its fixing and binding the same and cost of Binding wire supply of all meterials, labour and T&P etc complete but excluding GST.

644.23

-

-

... More
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in the proportion of 1:1.50:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire to be supplied by the contractor free of cost. Including making of drip coarse S.I. No. 283A but excluding GST.

13.3

-

-

... More
Mild steel or TMT Bars(Fe-500D grade or higher) orHYSD Bars or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) brought to required shape as necessary including bending for proper completion of the work and including supply of all steel. but excluding GST S.I.No. 504.

39.18

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.