Public Works Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 11,30,00,000
Costs
EMD
₹ 22,60,000Document Cost
₹ 5,590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEUVZ_975432_2Tender No
91/Camp/SE Tender/jnp-gzp circle/24 date 14-10-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://uppwd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stablized Sub-base (FDR Technology)- Providing, laying, spreading and compacting of existing granular material adding cement using truck mounted / self propelled cement spreader shall have variable working width with microproces., controlled spray rate through augers and cellular wheels. The aggregate shall be in situ pulverized/stabilize using four wheeled drive recycler having working depth up to 50 cm with variable depth control system. Compacting with vibratory roller Pneumatic roller and vibratory pad Foot pad roller (20 tonne) to achieve design uncofined compresive Stgrength. (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST ) as per direction of engineer-in-charge.
10395
-
-
Providing, laying, spreading of graded stone aggregate (WMM ) After Mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement & 3.5% emulsion in uniform singal layer on sub- base / base gread and compacting with the road roller to achieve the desired density (ETA). (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) as per direction of engineer-in-charge
5726
-
-
Providing and laying tack coat with bitumen VG-10 using emulsion bitumen distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom. As per MORTH clause 503 (i) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
58017
-
-
Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with senS.I. control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction. As per MORTH clause 507 (b) complete in all respects (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
2320
-
-
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete. As per MORTH clause 401 (b) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
358
-
-
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORTH clause 406 (b) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
233
-
-
Construction of sub-grade and earthern shoulders with approved materials obtained from borrowpits (lead 1 km) with all lifts & leads, transporting to site, spreading, gradding to required slope and compacted to meet requirement of table No 300-2. As per MORTH clause 305 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
4339
-
-
Earth work in excavation of foundation as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORTH clause 304 b (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST ) (for drain and hume pipe culvert)
1034
-
-
PCC M15 in Foundation Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. As per MORTH clause 1500 A (Case-ii) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
120
-
-
Reinforced Cement Concrete (M-20) in Open Foundation complete as per Drawing and Technical Specifications. As per MORTH clause 1500 C (Case-ii) (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
234
-
-
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications. As per MORTH clause No. 1600 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but excluding GST )
14.7
-
-
Plain Concrete with 4cm. gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per S.I. 275 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
7.6
-
-
M-150 brick in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and tools & plants, etc required for proper completion of the work. as per MORTH Specification. As per S.I. 305b (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
85
-
-
Providing and laying 350 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
40
-
-
Providing and laying 600 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
60
-
-
Providing and laying 900 mm dia NP-3 H.P. jointing with coller in proper position including cost of cemment, jute etc required for proper completion of work. But excluding cost of coller. As per S.I. 26 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
30
-
-
Struck pointing with cement mortar consisting of 1 part cement and 2 parts of fine sand of 1.25 fineness modulous including supply of all materials, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. As per S.I. 574 (Including Cost of All Matarial T&P, Royalty, Taxes, Labour Cess etc but Excluding GST )
198
-
-
PART B
Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
10
-
-
1st year- maintainance cost 0% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10
-
-
2nd year- maintainance cost 0.25% on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10
-
-
3rd year- maintainance cost 0.50 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10
-
-
4th year- maintainance cost 0.75% on Bituminous &drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10
-
-
5th year- maintainance cost 1.00 % on Bituminous & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%