Public Works Department Tender

... More
The PWD has issued a formal invitation for competitive bids for the Public Works Department project, for Janpad Sant Kabir Nagar Me Lok Nirman Vibhaag Ke Eantargat Sashikiye Bhawanon Par Solar Rooftop Ki Sthpna Ka Karya in Sant Kabir Nagar, Uttar Pradesh, with an estimated contract value of Rs. 6,41,000. The bid opening date for this tender is 07-11-2026 and the last date for bid submission is 24-11-2026. Interested bidders for Public Works Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Public Works Department - PWD Tender - UP Tender

Opening Date7 Nov 2026
Closing Soon24 Nov 2026
Tender Amount₹ 6,41,000 
Notes
Download

Costs

Description

Janpad Sant Kabir Nagar Me Lok Nirman Vibhaag Ke Eantargat Sashikiye Bhawanon Par Solar Rooftop Ki Sthpna Ka Karya

Contact

Unlock the Tender details

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

Unlock the Tender details
... More
Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz. output voltage suitable to generate AC with a variation of 10% at nominal voltage. Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. Minimum IP-65 for outdoor and Minimum IP 21 for indoor, Built-in meter and data logger, MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP PCU/inverter shall be capable of complete automatic operation including wake-up. synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode.It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection Minimum protections: Mains Under /Over Voltage, Over current, Over/Under grid frequency, Over temperature, Surge voltage induced at output due to external source, Shortcircuit, Lightening, Anti Islanding (for grid synch. Mode) and other protections as per applicable standards. LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485/RS 232

-

-

-

... More
Module mounting structure: The roof top solar plant generation units shall be installed by using supporting Aluminium/Galvanized MS structure (mass of zinc coating shall be as per IS4759) having minimum head room clearance of 2.4 meter above the terrace level / ground level. The mounting structure would be designed to sustain wind load and seismic parameter of the site of installation. All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts The suitable arrangements for maintenance and cleaning shall be provided.

-

-

-

... More
Fixing of Array junction box & main junction box with IP65 protection and termination arrangement for incomming and out going cable along with glands, lugs and other accessories etc. As required.

-

-

-

... More
Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc, as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminum /cast aluminum alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.

-

-

-

... More
Lightning, surge voltage protection, earthing protection and grid islanding.

-

-

-

... More
Cabies: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.

-

-

-

... More
DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection-interconnection, etc. as required.

-

-

-

... More
Inculiding Cleaning, Operation & Maintinance of Roof Top Panel System for Six Years as per market rate, after one year DLP (Total for Six Years) make - Adani/Tata/Warri/Equivalent

10

45803

458030

... More
B- Work of installation of solar rooftop on the government building (Inspection Building, Semriyawan) of Sant Kabir Nagar district.

-

-

-

... More
Supply, Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant conforming to various applicable standards BIS, IEC, MNRE guidelines, the Central Electricity Authority Regulations and CPWD Specifications as amended up to date, consisting of Mono/Poly Crystalline silicon solar cells module, net metering facility, necessary control, protections. earthing, cabling, mounting structure, junction boxes, power conditioning units, Real time online web interfaced Data grid connecting Monitoring System, Distribution panels, arrangement, conduits, pipes, cable trays and other accessories etc, as required.

-

-

-

... More
High Energy Efficiency Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2 Solar Photovoltaic Module conversion efficiency shall not be less than 23% at STC with temperature coefficient of Pmax better than -0.30% per degree Celsius. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. Solar Modules shall be designed to operate in relative humidity upto 100% with temperature between -10 Deg C and +85 Deg C. Further, each PV module used in any solar power project must have Radio frequency identification tag with information such as name of manufacturer, month and year of manufacturing, country of origin (separately for Solar cell and module), I-V curve, Unique Serial No and Model No of the module, Wattage, Im, Vm and FF. name of test lab issuing IEC certificate.

-

-

-

... More
Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz. output voltage suitable to generate AC with a variation of 10% at nominal voltage. Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. Minimum IP-65 for outdoor and Minimum IP 21 for indoor, Built-in meter and data logger, MPPT, switching devices IGBT/MOSFETs and controller Microprocessor /DSP PCU/inverter shall be capable of complete automatic operation including wake-up. synchronization & shutdown. The PCU shall be able to withstand unbalanced load conforming to IEC standard with shutdown/standby mode.It must be provided with grid islanding along with manual disconnect pole isolation switch besides automatic disconnection Minimum protections: Mains Under /Over Voltage, Over current, Over/Under grid frequency, Over temperature, Surge voltage induced at output due to external source, Shortcircuit, Lightening, Anti Islanding (for grid synch. Mode) and other protections as per applicable standards. LCD/LED display of minimum parameters: DC input voltage, DC current, AC Voltage and current (all 3 phases, in case of 3 phase), Instantaneous & cumulative AC output power, Daily DC energy produced and other parameters applicable standard. Communication interface RS 485/RS 232

-

-

-

... More
Module mounting structure: The roof top solar plant generation units shall be installed by using supporting Aluminium/Galvanized MS structure (mass of zinc coating shall be as per IS4759) having minimum head room clearance of 2.4 meter above the terrace level / ground level. The mounting structure would be designed to sustain wind load and seismic parameter of the site of installation. All the structure shall be design as per applicable BIS code and the material shall also confirm the applicable BIS Code. Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts The suitable arrangements for maintenance and cleaning shall be provided.

-

-

-

... More
Fixing of Array junction box & main junction box with IP65 protection and termination arrangement for incomming and out going cable along with glands, lugs and other accessories etc. As required.

-

-

-

... More
Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc, as required. Each junction box shall be made of GRP/FRP/Powder Coated Aluminum /cast aluminum alloy with full dust, water & vermin proof arrangement with High quality Suitable capacity Metal Oxide Varistors (MOVs) (semiconductor diode with resistant applied voltage)/ surge arrestors and suitable Reverse Blocking Diodes, isolation switches isolate the DC input to Inverter, copper bus bar etc.

-

-

-

... More
Lightning, surge voltage protection, earthing protection and grid islanding.

-

-

-

... More
Cabies: Connections & Interconnections by required size IR/UV protected XLPE insulated copper conductor 1.1 kV grade armored power and control cables(ISI Marked) along with supplying & fixing of necessary channel/conduit, GI cable trays, supports, lugs, thimble and other accessories etc. as required.

-

-

-

... More
DC Distribution Board And AC Distribution Panel Board: IP65, free standing, metal cladded, having copper bus bar, having required protection and control gears, connection-interconnection, etc. as required.

-

-

-

... More
Inculiding Cleaning, Operation & Maintinance of Roof Top Panel System for Six Years as per market rate, after one year DLP (Total for Six Years) make - Adani/Tata/Warri/Equivalent

4

45803

183212



Evaluation Notes How It Works ?

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.