Pashchimanchal Vidyut Vitran Nigam Limited Tender
... More
The PVVNL has issued a formal invitation for competitive bids for the Pashchimanchal Vidyut Vitran Nigam Limited project, for Release New Connection Of Differrent Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme Under Edd Jahangirabad in Hathras, Uttar Pradesh. The bid opening date for this tender is 06-06-2025 and the last date for bid submission is 13-06-2025. Interested bidders for Pashchimanchal Vidyut Vitran Nigam Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Pashchimanchal Vidyut Vitran Nigam Limited - PVVNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Jun 2025
Closing Date13 Jun 2025
Tender AmountRefer Documents
Costs
EMD
₹ 15,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PVVNL_1032064_3Tender No
01/EDC-III/BSR/2025-26Tender Authority
Pashchimanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://http://pvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
PCC 11 mtr Long from E.S.C Bulandshahr to Site
40
-
-
... More
PCC 8.5 mtr from E.S.C Bulandshahr to Site
80
-
-
... More
CT/PT unit Deffrent spacification from ESC. BSR to site
5
-
-
... More
Piffer ressitant metering cubicle from ESC. BSR to site including loading & unloading with the help of Crane.
5
-
-
... More
Cable 3x70 sqmm 11 KV XLPE from E.S.C Bulandshahr to Site including loading & unloading with the help of Crane. (sutable for one connection)
5
-
-
... More
Carrage 10/16 kva TF
4
-
-
... More
Carrage 25/63/100 kva TF
10
-
-
... More
Carriage of All line Material from store to site or j.e's store at Sub station as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc.
100
-
-
... More
Erection of Single support including complete LT/HT fittings as per RESPO PCC 11 mtr long.
36
-
-
... More
Erection of Single support PCC 8.5 mrt long/ STP 9 mtr/ STP 11 mtr. including complete LT/HT fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
114
-
-
... More
Erection of Double Pole support including complete fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
10
-
-
... More
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
114
-
-
... More
Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
10
-
-
... More
Grouting of D/P for installation of CT/PT unit & T/F shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
5
-
-
... More
Fixing of Stay rod with Stay wire in proper way with Nozelling.
60
-
-
... More
Mounting & Installation 25/63./100 kva T/F on the double Pole
10
-
-
... More
Grouting of Stay rods.
60
-
-
... More
Fixing of erathing rod.
160
-
-
... More
Laying of 3x70 sqmm 11KV XLPE cable openly from CT PT unit to meter room putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides.
5
-
-
... More
Laying of 3x70 sqmm 11KV XLPE cable putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides.
160
-
-
... More
Laying, sagging. Stringing and binding and jumpering of ACSR weasel, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
8000
-
-
... More
Mounting CT/PT unit on D/P with the help of Crane.
5
-
-
... More
Providing & Fixing of Cable Box suitable for 3X70 sqmm 11KV XLPE.
5
-
-
... More
Wrapping of Barbed wire
48
-
-
... More
Providing & Fixing Holding Clamps.
128
-
-
... More
Laying and ABC Cable
1020
-
-
... More
Providing & Fixing Stay Clamps.
60
-
-
... More
Providing & Fixing Stay Insulator.
60
-
-
... More
Providing Nut & Bolts off-size
240
-
-
... More
Installation & Errection of Piffer ressitant metering cubicle .
2
-
-
... More
Garding of 11 kv line/ road crossing as per site requarment.
10
-
-
... More
Extra Milage charges and carriage from PCC/ST Pole/TF & other material from each 10 Km.
1
-
-
... More
Above work shall be done as per UPPCL/RESPO Rules.
-
-
-