Orai Development Authority Tender
... More
The Orai Development Authority has issued a formal invitation for competitive bids for Construction Of Round Shape Crossing At Churki Bypass Orai in Jalaun, Uttar Pradesh, with an estimated contract value of Rs. 2,45,000. The bid opening date for this tender is 31-08-2019 and the last date for bid submission is 11-09-2019. Interested bidders for Orai Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Orai Development Authority Tender
Opening Date31 Aug 2019
Closing Date11 Sep 2019
Tender Amount₹ 2,45,000
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_ODAUP_376402_1Bid Award Id
ViewTender No
ODA/2019-20/05/455Tender Authority
Orai Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stone work (machine cut edges) for wall lining etc. (veneer work) upto 10 metre height, backing filled with a grout of average 12 mm thick cement mortar 1:3 (1 cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade : (To be secured to the backing and the sides by means of cramps and pins which shall be paid for separately) : Red sand stone - Exposed face machine cut and table rubbed with rough backing. 50 mm thick. DSR 7.23.2.3/2016
34
-
3537.1
... More
Dismantling reinforced Cement concrete or reinfored brick work, Including stacking of materials as direcred by engineer-in-charge with in a distance of 60 mt. (200feet) As per PWD SOR 694/2018
Total Length 15.70 mt.
2x3.14x2.50 =15.70 mt.
1
-
877
... More
R.C.C. Work with cement, approved coarse sand & 2cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. PWD SOR 287(1)2018
2
-
7473
... More
P/L cement concrete 8:4:1 in cement coarse sand and 4cm gauge stone grit including supply of all materials, labour, tools & plants etc. required for proper completion of the work. PWD SOR 281/2018
0.5
-
4799
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift be used in making embankment or to be deposited as spoil blanks with in 30 M. including 5.00 Km cartage complete as directed by the Engineer incharge. Including Royality. PWD SOR 253/2018
(126+173=269)
12
-
126
... More
Class-150 brick work in 1:3 cement and coars sand mortar in Super structure including supply of all materials, labour and tools and plants etc. required for proper completion of the work. PWD SOR 307/2018
1.6
-
5348
... More
P/L cement concrete 1:2:4 in cement coarse sand and 4cm gauge stone grit including supply of all materials, labour, tools & plants etc. required for proper completion of the work. PWD SOR 279/2018
0.4
-
5560
... More
M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorized overlapping shall be measured and including cost of binding wire. PWD SOR 504/2018
2.4
-
5666