Orai Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Orai Development Authority Tender

Works
Consultancy Services
Eprocure
Opening Date15 Jul 2019
Closing Date30 Jul 2019
Tender Amount₹ 24,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing laying, spreading and compacting graded stone aggregate to wet mix macadam specification stabilized with 4% cement including permixing the material with water at OMC in machanical mixer (Pug Mill) carriage of mixed material by tipper well prepared sub-base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired incuding lighting, barriading and maintenance of diversion etc as per tables 400.22&400.12 and technical specification clause 406. Including labour,material and T&P as per instruction by E/I. (Analysis rates)

47.49

-

2849.3

... More
20 mm thick open-Graded premix carpet using Bituminous providing laying and rolling of open-graded permix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG- 10 grade bitumen to required line, grade and level to serve as wearing couse on a previously prepared base, including mixing in a sutaible plant/mixol, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of type C as per Technical Sepecification Clause 508. Including labour,material and T&P as per instruction by E/I. (Analysis rates)

477.9

-

118.5

... More
Providing and laying seal coat sealing the voids in a bituminius surface laid to the speification levels, grade and cross fall using Type C as per Technical specification Clause 510 Including labour,material and T&P as per instruction by E/I. (Analysis rates)

477.9

-

42.9

... More
Providing and laying of 80 mm Interlocking conerete blocl pavoment laid in stone dust and fill joint with fine sand Joint filled after labling and derssing base including supply of all materical, labour, T&P etc required for proper comletion of the work. SI No- New item no-3

309.24

-

760

... More
Excavation in foundation in ordinary soil (Loam Clay, or sand) Including lift upto 1.5 metre (5fts.) and lead up to 30 m (100 fts) & Including filling, watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus rearth as directed by the Engineerin charge upto a distance of 30 m. (100 fts) from the foundation trenches. SI No. 251

165.03

-

139

... More
Concrete with 4 cm (1.5") gauge brick ballast fine local sand of 1.25 Fineness modulous and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and T&P etc. required for proper completion of the work. SI N0. 275

62.88

-

5222

... More
First class brick work in 1:4 cement and fine sand of 1.25 FM. Morter in foundation and plinth including supply of all materials,labour and T&P etc. required for proper completion of the work. SI N0. 305

72

-

5135

... More
Cement concrete with 4cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4:2:1 Including supply of all materials labour and T&P etc. required for proper completion of the work. SI No. 279

10.67

-

5560

... More
12 mm cement plaster in single coat fair side of single of half brick wall for interior plastering upto floor two including internal rounded angles chamfers , and/or rounded angle not exceeding 80 mm in girth and finished even and smooth No extra for mixing ant additive. SI No. 17.58 (II) 1 Cement: 4 Fine sand

313.02

-

144

... More
Excavation in foundation in ordinary soil (Loam Clay, or sand) Including lift upto 1.5 metre (5fts.) and lead up to 30 m (100 fts) & Including filling, watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus rearth as directed by the Engineerin charge upto a distance of 30 m. (100 fts) from the foundation trenches. SI No. 251

22.16

-

139

... More
Concrete with 4 cm (1.5") gauge brick ballast fine local sand of 1.25 Fineness modulous and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and T&P etc. required for proper completion of the work. SI N0. 275

7.28

-

5222

... More
First class brick work in 1:4 cement and fine sand of 1.25 FM. Morter in foundation and plinth including supply of all materials,labour and T&P etc. required for proper completion of the work. SI N0. 305

10.44

-

5135

... More
Cement concrete with 4cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4:2:1 Including supply of all materials labour and T&P etc. required for proper completion of the work. SI No. 279

1.27

-

5560

... More
12 mm cement plaster in single coat fair side of single of half brick wall for interior plastering upto floor two including internal rounded angles chamfers , and/or rounded angle not exceeding 80 mm in girth and finished even and smooth No extra for mixing ant additive. SI No. 17.58 (II) 1 Cement: 4 Fine sand

18

-

144

... More
R.C.C work with cement approved coarse sand and 2 cm. (3/4'') gauge approved stone ballast in the proportion of 1:1.5:3 in slab excluding supply of reinfornement and its bilding but including its flxing and binding the same with 24 B.W.G.G.I binding wire and including supply of all matericals, labour & T&P etc. required for proper completion of the work. Binding wire cost being including in the item. Sl. No. 284(1)

7.78

-

8139

... More
Mild steel or iron in plain work such as reinfored concrete or reinforced brick work (when not include in an over all rates) wrouhgt to required shape as necessary including bending for proper completion of the work and icnluding supply of all steel and wastage & overlaping & hooks. Sl No. 504

9.17

-

5666

... More
Excavation in foundation in ordinary soil (Loam Clay, or sand) Including lift upto 1.5 metre (5fts.) and lead up to 30 m (100 fts) & Including filling, watering and ramming of excavated earth into the trenches of into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus rearth as directed by the Engineerin charge upto a distance of 30 m. (100 fts) from the foundation trenches. SI No. 251

65.04

-

139

... More
Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 km (5 miles) from the site of work and including watering, dressing etc. Rate to include cost of all marerials, labour and T&P etc. required for proper completion of the work. (Rate is Including Royality) SI No. 255

8.67

-

1647

... More
Concrete with 4 cm (1.5") gauge brick ballast fine local sand of 1.25 Fineness modulous and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and T&P etc. required for proper completion of the work. SI N0. 275

16.26

-

5222

... More
First class brick work in 1:4 cement and fine sand of 1.25 FM. Morter in foundation and plinth including supply of all materials,labour and T&P etc. required for proper completion of the work. SI N0. 305

84.28

-

5135

... More
Cement concrete with 4cm (1.5") gauge approved stone ballast approved coarse sand and cement in the proportion of 4:2:1 Including supply of all materials labour and T&P etc. required for proper completion of the work. SI No. 279

1.66

-

5560

... More
12 mm cement plaster in single coat fair side of single of half brick wall for interior plastering upto floor two including internal rounded angles chamfers , and/or rounded angle not exceeding 80 mm in girth and finished even and smooth No extra for mixing ant additive. (II) 1 Cement: 4 Fine sand SI No. 17.58

541.98

-

144



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.