North Central Railway Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

North Central Railway - NCR Tender

Works
Machinery and Tools
Ireps
Opening Date29 Jan 2025
Closing Date24 Feb 2025
Tender Amount₹ 2,19,64,205.65 
Notes
Download

AI Insights

Bid Capacity
... View More
The bid capacity required is V/N or 'V' whichever is less, where V = Advertised value of the tender in crores of Rupees, N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover should be calculated as (Total contractual payments in the previous three financial years) / 3.
Technical Capacity
... View More
The bidder must have successfully completed or substantially completed any one of the following categories of work(s) during the last 7 years: (1) Three similar works each costing not less than 30% of the advertised value of each component of the tender, (2) Two similar works each costing not less than 40% of the advertised value of each component of the tender, (3) One similar work each costing not less than 60% of the advertised value of each component of the tender. For subcontractors, they must have successfully completed at least one work similar to the work proposed for subcontract, costing not less than 35% of the value of the work to be subcontracted, in the last 5 years. Additionally, work experience certificates from public listed companies having an average annual turnover of Rs 500 crore and above in the last 3 financial years will also be considered. The required prior work experience includes similar work, which is defined as any signaling or telecom work. The bidder should submit a work experience certificate issued by a public listed company having an average annual turnover of Rs 500 crore and above in the last 3 financial years, excluding the current financial year. The values and percentages mentioned for similar works completed are: - 30% of the advertised value of each component of the tender for three similar works - 40% of the advertised value of each component of the tender for two similar works - 60% of the advertised value of each component of the tender for one similar work - 35% of the value of the work to be subcontracted for subcontractors. The amount of Rs 500 crore is mentioned as the average annual turnover for public listed companies.

Costs

Summary

S&t Work In Connection With The Work Of "construction Of Subways In Lieu Of Level crossing No.471, 476 & 486 Due To Commissioning Of Automatic Signaling In Agra- dholpur Section".

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fabrication and fixing of phenolic laminated sheet of grade P3, minimum 10 mm thick,as per Apparatus case diagram/plan, in location box by providing all fixtures like ARA/Disconnect 04 terminals, fuse blocks, fuses, relays on square bars etc. including fixing of PVC coated string rods at the back side for cable support with contractor's own material like iron angle, nuts, bolts etc. The iron angle for fixing shall be minimum 3 mm thick. This also includes fixing of teak wood shelf minimum 25 mm thick for holding track circuit equipments. The work shall be done as per instructions of Rly engineer at site. (Apparatus case Full)

6

4478

26870.88

... More
Supply of Disconnect Terminal block for four conductors with screwing cage/clamp type, sliding switch disconnect, as per RDSO spec. RDSO/SPN/189/2004 Ver. 3.0 or latest, for each conductor size up to 2.5 sq. mm, equivalent of M6 terminals. Each terminal block equipped with two markers, on top and bottom, an end plate, two end clamps and adequate length of rails for fitting terminal blocks.

2400

192

462744

... More
Supply of 24 fiber optical fiber cable straight joint enclosure (SJC) complete with all 06 accessories along with enclosures with heat shrinkable splice protection sleeve as per RDSO spec. RDSO/SPN/TC68/2014 Revision 1.0, Amndt. 1.0 or latest. Splice losses in no case should be more than 0.1 dB. (Inspection by Consignee)

24

5506

132161.04

... More
Supply of thermo shrink jointing kit as per RDSO Specn.No. IRS: TC 77-2012 (Rev.3.0) with (Amdt.-1 to 3) or latest, suitable for 6 Quad/jelly filled cables for straight through/derivation joints. It includes supply of all the accessories, without transformer. (Inspection by Consignee)

60

3361

201715.2

... More
Supply of Double Walled Corrugated (DWC) Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non flame propagating type in 6 meters straight length and of size 120 mm outer dia,& 103.5 mm inner dia. 08 (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One coupler with suitable rubber O-ring should be supplied with every 6m of pipe length. (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vendor name and year of manufacture can be easily identified. (Inspection by Consignee)

500

656

328295

... More
Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal 09 blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. The work shall be carried out a per instructions of railway Engineer incharge.(Supply of all above terminals has been covered separately).

2400

18

43464

... More
Horizontal boring under railway track/ road etc for laying all dia, DWC (Double Walled 10 Corrugated) pipes at the depth of 1.4 meter to 2.1 meter from formation level (Level of earth below ballast) as per drawing and directed by engineer-in-charge by trenchless technology excluding the cost of DWC pipes.

500

913

456660

... More
Blowing/drawing of OFC cable in the HDPE pipe duct and protective work already 11 provided in the trench. The cable shall be laid only after the successful completion of the DIT (Duct Integrity test). The DIT should be certified by the Railway engineer at site. All the equipments/machinery required shall be arranged by the contractor.

6

17093

102558.3

... More
Supply of permanently lubricated HDPE duct, 40 mm outer dia, as per RDSO spec. No. RDSO/SPN/TC/45/2013 Rev.2 Amndt.2 or latest, along with all accessories like end caps, collars, bends, couplers etc. (Inspection by RITES)

8

76811

614491.36

... More
Laying of HDPE duct as per the approved cable route plan in the exavated trenches/other protected works/RCC channel etc. including all accessories like end caps, collars, 13 bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings no. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8(a) respectively, issued vide Chapter-XIII of the Telecomm Manual.

8

8092

64738

... More
Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes 14 laying of cables in track crossings & road crossings.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes.

30

6840

205200

... More
Digital multimeter model no.18-S of Riishabh,waco,kusum-maco make. (Inspection by Consignee)

2

22736

45472.06

... More
Splicing of 24 core optic fibre cable and making the splicing joint with contractor's own 16 machine and tools. Joint should be prepared in such a way that the top of the enclosure should be at a depth of minimum 1.2 mtr and the enclosure should be covered with soft soil and bricks. Splice loss of each fibre should be less than 0.05 dB.

24

12011

288282

... More
Excavation, casting, curing of foundation and Installation and Erection of Apparatus 17 case Full (App. Case as per RDSO drg. no. RDSO/S-11500 or latest) with contractor's own frame, cement and other material in the ratio 1:3:6. 'E' type lock to be supplied and installed with App. case. This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder , switch and lamp etc. in Apparatus Case.

13

12277

159611.53

... More
Excavation, casting, curing of foundation and Installation and Erection of Apparatus 18 case Half (App. Case as per RDSO drg. no. RDSO/S-11507 or latest) with contractor's own frame, cement and other material in the ratio 1:3:6.'E' type lock to be supplied and installed with App. case. This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder , switch and lamp etc. in Apparatus Case.

13

10332

134318.86

... More
Installation of thermo shrink jointing kit as per RDSO Specn.No. IRS: TC 77-2012 (Rev.3.0) with (Amdt.-1 to 3) or latest, suitable for 6 Quad/jelly filled cables for straight through/derivation joints. It includes supply of all the accessories, without transformer.

85

1682

143043.95

... More
Termination of Outdoor Cables (Main Cables /tail cables) at ARA/Disconnect type 20 terminals provided in Apparatus Cases, Cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. Per

4800

70896

70896

... More
Supply of Track feed Battery Charger as per RDSO Specn. No.IRS: S-89/2013 Ver.1.0 or latest. Charging capacity rating should be suitable for charging 80 AH Battery. (Inspection by RDSO)

10

5903

59032.5

... More
Supply of Track Lead Junction Box(TLJB), 4 way, 250 mm x 255 mm x120 mm made from FRP, as per Drg.No. 20101/M(IRS) or latest, including brass bolts and hylam board sheet with terminals etc. The FRP material shall be as per RDSO spec. RDSO/SPN/151/1997 or latest.The technical specifications are as follows: (a) TLJB complete with cover to be in black/red/grey with all the 23 holes required for mounting on FRP stump (vertical two for each FRP angle) HDPE pipe , cable etc. (b) Each TLJB shall have two bakellite terminal block fitted horizontally, each bakellite terminal block shall have two nickel chrome plate with brass terminal. Alongwith each TLJB , nickel chrome plated brass links(two nos.of adequate strength for vertical linking of the terminals to be supplied. (c) HDPE pipe alongwith two nuts for fixing on the TLJB hole . (d) The FRP stump for mounting the TLJB (Inspection by Consignee)

22

5339

117476.04

... More
Erection, fitting and Rail connection of track lead junction box with contractor's fixing material including angle of size 40 x 40 x 5 mm1200mm length. This will include drilling of holes for side connection. The work shall be done as per instruction of Rly. Engineer at site.

-

-

24

... More
Supply of Colour Light Signal Post, Tubular Mild steel, 4.5 m length, 140 mm Dia, as 25 per RDSO spec. No. IRS: S-6/81 or latest and Supply of cast iron Main signal surface base (As per RDSO Drg. No. 2011/M or latest), with CLS ladder assembly suitable for colour light signal 4.5 m long, as per RDSO drg. No. SA 23153 and signal front staging complete assembly and complete signal back staging for CLS unit. (Inspection by Consignee)

6

25285

151711.2

... More
Casting, concreting and curing of foundation for Main Signal Post in the ratio of 1:3:6 as per NCR drg.No. TYP/013/14/SIG FOUND. dtd 12.11.2014 (total 2 sheets of drawing) issued vide NCR Letter no. S&T/NCR/DRG/TYP dated 13.11.2014, using standard size of foundation/galvanized 26 anchor bolts complete, required for erection of colour light signal post. Anchor bolts complete should comply with the RDSO drg. no. SA 116 A/M. Item includes excavation, ramming of CC using vibrator, curing and plastering with 1:4 cement-sand mixture (aggregate will not exceed 3.8 cm). Aggregate, cement, sand and holding down bolts will be supplied by contractor. Any machines & tools, if required for execution of this item, will be arranged/provided by contractor.

6

13512

81074.58

... More
Casting, concreting and curing of foundation for Position Light Shunt Signal as per Drg.No.NR/S&T/Const/2.2/97 using standard size of foundation/galvanized anchor bolts complete, 27 required for erection of shunt signal post. Anchor bolts complete should comply with the RDSO drg. no. SA 116 A/M. Item includes excavation, ramming of CC using vibrator, curing and plastering with 1:4 cement sand mixture. Aggregate cement, sand and holding down bolts, will be supplied by contractor. Any machines and tools, if required for execution of this item, will be arranged/provided by contractor.

1

3670

3670.33

... More
Erection of CLS Post with base and signal unit on top or on Offset Bracket including erection of auxiliary signals like calling on, shunt signal if any. It includes fixing of all LEDs and wiring 28 of complete signal including route and auxilliary signals, if any. It includes fixing of front and back staging, ladder and guards, signal name plates / boards, with contractor's own brackets and fixing materials. The work shall be done as per instructions of Rly engineer at site. It also includes provision & fixing of maintenance platform as per design given by Engineer -In-Charge at site. The Item includes cutting of Signal post if required by Site In charge.

6

5881

35288.52

... More
Erection of Position Light Shunt signal with Base, Post, Signal unit, complete fixing of LEDs and wiring of full signal. It includes fixing of Number Plates. The work shall be done as per instructions of Rly engineer at site.

1

951

951.48

... More
Supply of Non Metallic (FRP) colour light signal housing multi unit type for railway 30 signalling suitable for RE area FOUR Aspects, complete without lenses, lamps and signal transformer as per RDSO Drg. No. SA 23001 A/M (Adv.) and as per RDSO spec. No. RDSO/SPN/ 194/2006 (Rev 2.0) or latest and FRP material as per RDSO SPEC. No. RDSO/SPN/151/1997 or latest. (Inspection by Consignee)

2

42250

84500.14

... More
Supply of Position Light Shunt Signal Unit Complete, Metallic, Post type, along with Offset bracket, Hood, Cover, mounting socket etc as per Drg. No. SA-23840 (Adv.) or latest, suitable for LED Signal Lighting Unit.(Supply of LED Unit is not covered in this item) (Inspection by Consignee)

1

8856

8856.29

... More
Supply of Non Metallic (FRP) colour light signal housing multi unit type for railway 32 signaling suitable for RE area TWO Aspects, complete without lenses, lamps and signal transformer as per RDSO Drg. No. SA 23003 A/M (Adv.) and as per RDSO spec. No. RDSO/SPN/194/2006 (Rev 2.0) or latest and FRP material as per RDSO SPEC. No. RDSO/SPN/151/1997 or latest. (Inspection by Consignee)

4

31322

125289.4

... More
Supply of Cable fault locator for metallic S&T cables of reputed make Aplab/Stanley/3M etc. Item to be supplied after successful demonstration and approval of Railways. (Inspection by Consignee)

1

301578

301578.02

... More
Supply of Digital AC/DC Leakage Clamp on meter, make Rishabh model ALCT 60A AC/DC or similar. (Inspection by Consignee )

2

20209

40419.8

... More
Supply of Optical Power Meter, type-B, as per TEC spec. GR/OPM-01/03 Feb. 2005 or latest. (Inspection by Consignee)

1

17742

17742.61

... More
Cement concrete work for miscellaneous, unscheduled items in ratio 1:3:6 of cement, 36 coarse, sand and aggregate Item includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture in ratio 1:4 (aggregate will not exceed beyond 3.8 cm). The aggregate cement and sand will be supplied by contractor. 37

10

5109

51096.2

... More
Cross trench for identification of the route of existing signaling and telecom cables.

200

290

58084

... More
(a) Design, preparation and supply of the following Technical documents: (i) Installation, Testing, Commissioning and Maintenance manuals . (ii) Functioning and System overview manuals .(b) Design, preparation and supply of the following the following completion documents: (i) Application Logic circuits.(ii) VDU/CCIP/LCP diagram .(iii) Interface Circuit/Wiring diagrams consisting of Relay contact analysis chart, Relay disposition chart, Relay contact to contact wire list chart, LCP/VDU/CCIP cable termination chart, Power supply diagram, Electronic signalling equipment and Power supply layout diagram, Relay rack and Cable termination rack layout diagram, Relay rack and Cable termination rack particulars, Fuse, Resistors, Condensors etc. particulars, Details of Analog and 38 digital inputs to be supplied to Data logger, Block wiring diagram (if applicable), Wiring diagrams for SSDAC or HASSDAC or MSDAC or BPAC (if applicable) (iv) Cable Route plan with overlaid Location Boxes placement (As per NCR HQ Drg. No. TYP/14/0017 issued vide letter no. S&T/NCR/DRG/TYP dtd 29.12.2014) (v) Cable Core plan with overlaid Location box placement (vi) Location huts/Goomties wiring diagrams (if applicable) (vii) Location boxes wiring diagrams (viii) Track circuit bonding plan (ix) Earthing particulars plan (x) Signal Interlocking plan (SIP) (xi) Station working rule diagram (SWRD) (xii) Station working rule (SWR) (xiii) Selection table/ Route control chart.All the above completion documents should be supplied as follows: (i) Two sets initially for approval and commencement of work (ii) One set in soft copy (in editable AUTOCAD format) in Pen drive. (iii) One set of Original tracings (iv) Six sets of final 'As Made' completion plans/diagrams in proper bounded form

3

177255

531766.8

... More
Design, FAT and submission of as planned and as build interface drawing, application logic & equivalent circuits in connection with alteration work.

3

2041268

6123804

... More
Alteration in existing relay room this include supply of wiring materials required for alteration, alteration in indoor wiring including datalogger, SAT and commissioning in connection with alteration work.

3

1368960

4106880



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.