Directorate Of Urban Local Bodies Tender
... More
The DOLBU has issued a formal invitation for competitive bids for the Directorate Of Urban Local Bodies project, for Construction Work In Hakikat Khudabas Pappu Se Kabul Ke Makan Tak Nali Aur Interlocking in Ghaziabad, Uttar Pradesh, with an estimated contract value of Rs. 30,73,548. The bid opening date for this tender is 03-03-2023 and the last date for bid submission is 13-03-2023. Interested bidders for Directorate Of Urban Local Bodies tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Directorate Of Urban Local Bodies - DOLBU Tender
Opening Date3 Mar 2023
Closing Date13 Mar 2023
Tender Amount₹ 30,73,548
Costs
EMD
₹ 3,07,355Document Cost
₹ 3,658Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DOLBU_780663_3Bid Award Id
ViewTender No
2838/NPP/LONI/2022-23Tender Authority
Directorate Of Urban Local Bodies ViewPurchaser Address
-Website
http://http://localbodies.up.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
12 mm thick plaster (1:4) with cement & coarse sand minimum thickness n-ot to be less than 1 cm including supply of all material labour T&P etc. required for proper completion of the work s.i no 584 new item
522
104400
200
... More
P.C.C.(1:2:4) cement concrete with 20 mm gauge approved stone ballast including supply of all material, labour and t&p etc. s.i no 279 (a)
15.53
109486
7050
... More
Supplying & Laying of 80 mm precast cement concrete I -shape Interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimesion 200x(160+120mm) O.P. Cement , smoot high gloss finish, skid resistant manufactured from rubber moulds through vibro- compression mechanism . The compressive strength of concrete paver block shall not be less than 30Mpa (m-30) and weight 5kg per no. conferming to IS:15658-2006 including cost of material ,labour ,T&Petc required for proper completion of the work as directed by Egneer-in charge. But excluding UP TT which shall be paid extra as rules.
1440
1121760
779
... More
GST
18
468846
2604702.05
... More
Collection and consolidation of WBM top coat with 22.4 -53mm gauge stone ballast including supply of stone ballast of approved quarry, royalty.carriage uplo site loading unloading stacking, testing charges, trade tax and other taxes, octroi levies to and also including opening out stacks spreading stone ballast to required cambor and template and making mendies to retain water and also all leads and lifts, water charges,watering and compacting with 8-10 tonne smooth wheeled road roller, including all hire fuel charges of the roller and blinding with Type B screening materials required for propor completion of work. Including all material, labour, T&P, taxes, labour coss etc. complete as per direction of Engineer in charge but excluding GST (mord 405)
108.01
367234
3400
... More
Supplying, fiting and placing HYSD bar reinforcement in Foundation Complete as per Drawing and technical specifications Clause 1000 and 1202
190.82
15647
82
... More
P.C.C.(1:6:12) cement fine sand and brick Ballast in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 273
43.2
172800
4000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements