Moradabad Development Authority Tender

... More
The Moradabad Development Authority has issued a formal invitation for competitive bids for 16- Construction Of Boundary Wall Of Mmig And Ews Houses Pockets Constructed Under Samajwadi Awasiya Yojana In New Moradabad in Moradabad, Uttar Pradesh, with an estimated contract value of Rs. 41,97,815. The bid opening date for this tender is 08-04-2022 and the last date for bid submission is 29-04-2022. Interested bidders for Moradabad Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Moradabad Development Authority Tender

Opening Date8 Apr 2022
Closing Date29 Apr 2022
Tender Amount₹ 41,97,815 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Finishing walls with superior quality water proof cement paint of approved make and quality on new work with two coats of give even shade i/c priming coat, preparing surface with appling putty the througly cleaning and sand preparing and supply of all materials, labour and T&P etc. requried for proper completion of the work . (P.S. rate)

2570

-

73

... More
M-150 Class brick work in 1 : 4 (one part cement & four part of coarse sand of 2.75 F.M.) mortar in super structure including necessary cutting & moulding of bricks as required thickness of walls 4.5" (Half brick) including supply of all materials,labour, T&P required for proper completion of the work. S.I. 307(A)+309+310(a)/UPPWD SOR-2020

25

-

5415

... More
Concrete with 4 cm. gauge brick ballast, fine sand and cement in proportion of 8:4:1 in foundation and under floors including supply of all material, labour, T&P etc. required for proper completion of the work.( S.I NO. 275/2020

26

-

3250

... More
RCC work with cement approved coarse sand and 2cm (3/4")gauge approved stone ballast in the proportion 1:1½:3 (1 cement : 4½ aggregates) in raft foundation and footing excluding of reinforcement including its bending the same with 24 BWG binding wire and necessary centering & shuttering etc and also including supply of all material, labour, T&P etc. required for proper completion of work.(SOR No 287

81

-

6600

... More
M.S (Tor steel or plain) in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage, bend hooks and authorised overlapping shall be measured.(S.I. No. 504/UPPWD SOR-2020

193

-

6100

... More
R.C.C work with cement,approved coarse sand & 2 cms. gauge approved crushed stone grit in proportion of 1 :1.5 :3 in lighter beam excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 BWGGI binding wire & including necessary centering & shuttering etc. required for proper completion of work. Binding wire is to be supplied by the contractor free of cost. (S.I. No.285+rate diff./UPPWD SOR-2020)

39

-

7800

... More
M-150 Class brick work in 1 : 4 (one part cement & four part of coarse sand of 2.75 F.M.) mortar in super structure including necessary cutting & moulding of bricks as required thickness of walls 4.5" (one brick) including supply of all materials,labour, T&P required for proper completion of the work. S.I. 307(A)+309/UPPWD SOR-2020

123

-

5315

... More
Dismentling brick work or stone work in lime in cement mortor & including stacking of material as directed by E/I. with a distance 60mt. (200fit).

145

-

75

... More
Painting two coats over one priming coat on wood or steel and other metal surface with superior synthetic enamel paint of standarad make brushing to give an even shade and finish and including cleaning the surface of all dirt dust and other foreign matter, sand papering and stripping including cost of all materials, labour,T&P etc. required for proper completion of work.[CH-15 p.35,36 S.I. 1A+2+4(3)/UPPWD SOR-2020

65

-

80

... More
12 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. ( S.I.No.584)/2020

2302

-

180

... More
M-150 brick work in 1:4(one part of cement and four part of fine sand of 2.2.M) cement mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work. (S.I. No 307/2020

40

-

4800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.