Minor Irrigation Department Tender
... More
The Minor Irrigation Department has issued a formal invitation for competitive bids for Deepening And Renovation Of Pond In Village -solana Me Badhi Jhohad Walatalab, Solana, Block - Dhaulana Distt.- Hapur. in Hapur, Uttar Pradesh, with an estimated contract value of Rs. 28,83,000. The bid opening date for this tender is 09-06-2025 and the last date for bid submission is 17-06-2025. Interested bidders for Minor Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Minor Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date9 Jun 2025
Closing Soon17 Jun 2025
Tender Amount₹ 28,83,000
Costs
EMD
₹ 2,89,000Document Cost
₹ 854Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPMID_1046786_1Tender No
106/EE Dt. 30.05.2025 (E-49/2025-26)Tender Authority
Minor Irrigation Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Digging of Pond upto 3.00m deep By Excavator Machine (Poclain) and Including Shifting of excavated soil to Bund of Pond by Tractor Trolley.
7440.28
-
-
... More
Earth work in manual dressing & Profile making of bund including remming and dressing the surface to required levels and slopes.(15.0% Earth actual qty for Bund) As per IDS. Chapter-V Item no 4
744.03
-
-
... More
Dewatering Before and during the digging earth work, by diesel pumpset.
313
-
-
... More
Construction work of Inlet 3 nos :-
-
-
-
... More
E/W in digging in foundation in ordinery soil.
32.55
-
-
... More
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
13.44
-
-
... More
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
30
-
-
... More
(ii) Laying and jointing of 900mm dia Hume pipe in position, jointed with jute and stiff mixture of cement morter in 1:2 cement and fine sand including testing of joints complete, labour and T&P etc. required for proper completion of work.
30
-
-
... More
First class Brick work in 1:4 Cement, Sand mortar including all.
20.07
-
-
... More
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
1.71
-
-
... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
75
-
-
... More
Construction work of Outlet :-
-
-
-
... More
E/W in digging in foundation in ordinery soil.
22.76
-
-
... More
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
3.77
-
-
... More
(i) Supply of RCC Hume pipe 900mm dia, NP-3 ISI mark including cartage, loading & Unloading and all tax etc. supply at work site.
10
-
-
... More
(ii) Laying and jointing of 900mm dia Hume pipe in position, jointed with jute and stiff mixture of cement morter in 1:2 cement and fine sand including testing of joints complete, labour and T&P etc. required for proper completion of work.
10
-
-
... More
First class Brick work in 1:4 Cement, Sand mortar including all.
6.58
-
-
... More
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
0.32
-
-
... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
25.85
-
-
... More
Construction work of Ramp :-
-
-
-
... More
E/W in digging in foundation in ordinery soil.
60.14
-
-
... More
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
13.79
-
-
... More
First class Brick work in 1:4 Cement, Sand mortar including all.
14.07
-
-
... More
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
5.68
-
-
... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
17.75
-
-
... More
Construction work of Ghat :-
-
-
-
... More
E/W in digging in foundation in ordinery soil.
30.22
-
-
... More
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
12.42
-
-
... More
First class Brick work in 1:4 Cement, Sand mortar including all.
20.29
-
-
... More
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
3.58
-
-
... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
55.25
-
-
... More
Construction work of Pacca Benches and other work in pond:-
-
-
-
... More
E/W in digging in foundation in ordinery soil.
3.78
-
-
... More
C.C.1:4:8 in Foundation with cement, Fine sand and 40 mm gauge Brick ballast, including all.
3.49
-
-
... More
First class Brick work in 1:4 Cement, Sand mortar including all.
13.12
-
-
... More
Brick on edge 1:6 cement, sand morter .
105
-
-
... More
C.C.1:2:4 in cement, coarse sand and 10 to 20 mm stone grit, including all.
0.63
-
-
... More
Cement plaster 1:4 cement, Sand, mortar including all material & labour etc.
52.56
-
-
... More
Supply and Fixing of steel Sing Board
-
-
-
... More
Sing Board
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%