Minor Irrigation Department Tender

... More
The Minor Irrigation Department has issued a formal invitation for competitive bids for Renovation Of Pond In Village- Hisawada, Block-pilana, Distt- Baghpat in Bagpat, Uttar Pradesh, with an estimated contract value of Rs. 27,42,000. The bid opening date for this tender is 17-10-2022 and the last date for bid submission is 31-10-2022. Interested bidders for Minor Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Minor Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date17 Oct 2022
Closing Date31 Oct 2022
Tender Amount₹ 27,42,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
S/F 600 mm Dia hume pipe NP-3

7.5

-

-

... More
Earth work in Excavation in Ordinary Soil with Poclain Machine including disposal of excavated earth up to 2 km. distance

5589.11

-

-

... More
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS

1.8

-

-

... More
CONSTRUCTION OF DESILTING CHAMBER

-

-

-

... More
Construction of Inlet

-

-

-

... More
Earth work in Excavation in Ordinary Soil with Poclain Machine and shifting of Excavated Soil with Tractor Trolly

3360.48

-

-

... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.

0.68

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

1.64

-

-

... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.

26.94

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

1.53

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

0.42

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

14.16

-

-

... More
Earth work:-

-

-

-

... More
M.S OR IRAN WORK OF SMALL SIZE AND SECTION I/C PROPER COMPLETION OF THE WORK (TOP COVER / ZAL AND TWO SIDE ZALI WITH OPENING ARRANGEMENT FACILITY )

4.5

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

14.4

-

-

... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.

67.5

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

12.54

-

-

... More
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

8.1

-

-

... More
REMOVING SEWAR AND JALKUMBHI FROM POND AREA

3900

-

-

... More
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.

3.3

-

-

... More
CONSTRUCTION OF FLAG HOISTING WORK

-

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

3

-

-

... More
SUPPLY AND FIXING OF IRON ROD 63 MM SIZE FOR FLAG HOISTING,PAINTING WORK OF FLAG HOISTING PLATFARM ETC. I/C ALL COMPLETE

4

-

-

... More
DEWATERING BEFORE AND DURING DIGGING

425

-

-

... More
Brick work in masonary in 1:4 cement & course sand mortar

17.58

-

-

... More
Painting roofs or othar iron work in large areas with one coat priming and one coat of approved (above one Sq.Metre) paint (British antesol or equivalent) including supply of all materials labour Tools & plants etc. required for proper completion of the work. Paint to be used ISI Marked. as per

36

-

-

... More
Construction work of Ramp :-

-

-

-

... More
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK

3.74

-

-

... More
Construction of Outlet :-

-

-

-

... More
EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C ALL COM.

90

-

-

... More
S/F OF M.S IRON SIGN BOARD

1

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

10.48

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

17.82

-

-

... More
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

0.64

-

-

... More
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.

3.68

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

53.46

-

-

... More
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge

1.3

-

-

... More
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.

29.64

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.