Kanpur Electricity Supply Company Limited Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Kanpur Electricity Supply Company Limited - KESCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Apr 2025
Closing Soon23 May 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Work Of Attending Breakdowns Of 11 Kv And Lt O.h. And U.g. Lines Under The Area Of Executive Engineer,scada And Adms, Kesco. Kanpur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying, stringing, tensioning and binding of Old & New Dog conductor for H.T./L.T. O.H.

4000

-

-

... More
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line Single Core L.T. Cable

90

-

-

... More
Reparing of B panel distribution box MCCB other auxiliary items.

25

-

-

... More
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 3 ½ Core L.T. Cable

90

-

-

... More
Restoration of Metallic/RCC road after proper reparing with appropriate materials.

300

-

-

... More
Loading, Carriage and unloading of PCC Poles from store to work site.

40

-

-

... More
Mounting & Erection of three phase distribution box. Old & New

600

-

-

... More
Making of cable box for 11/6.6 KV 3x50 to 3x300 mm2 for XLPE/PILLCA cable (Jointing kit will be provided by Kesco.)

201

-

-

... More
Fitting of L.T. D.B. by brackets & clamps on double pole structure & L.T. Cable Connection from T/F Cable to L.T.D.B.

25

-

-

... More
Taking out (old & used) H.T. cable by digging of trench from site and then rolling in to bundles.

30

-

-

... More
Opening of L.T. Jumpers from the existing L.T. O.H. line for erection work.

29

-

-

... More
Excavation of foundation and taken out the damaged pole/pole to be replaced/shifted from the ground.

110

-

-

... More
Jumpering of H.T. Lines from the existing H.T.O.H. line.

60

-

-

... More
Digging of cable trench in Normal Soil (size of 30cm. Wide and 60 to 90 Cm. meter deep as per site requirement for laying of cable)-

30

-

-

... More
Dismentalling of Aearial Bunched Cable from L.T. O/H (damage) line.

6000

-

-

... More
Laying of Old & New Aearial Bunched Cable for Erection of L.T. O/H Line.

6000

-

-

... More
Erection of Distribution T/F on plinth/D/pole structure.

25

-

-

... More
Cutting of tree branches for normal clearance of H.T. as well as L.T.O.H. Lines.

700

-

-

... More
Laying of L.T. Cable in the above digging, trench, covering with bricks, sand and back filling.

90

-

-

... More
Grouting of pole with cement brick ballast and coarse sand as per Standard Spacification.

350

-

-

... More
Dismentalling of binding wire from insulators and lossening of the conductor on each pole then lowering down the conductor & rolling in to bundles.

4000

-

-

... More
Loading, carriage and unloading of Aearial Bunched Cable from store to work site and vice versa.

6000

-

-

... More
Painting of pole after rubbing cleaning with emery paper and coating with one coat of red oxide on full length of pole and then two coat of aluminum paint.

350

-

-

... More
Erection of new PCC pole for L.T. O.H. line and fitting of all related hardware

40

-

-

... More
Digging of pit and making of 300x300x450 mm chamber with brick & sand work covered with RCC surrounding the GI Pipe with Cover. all material shall be provided by contractor with cost of all material.

43

-

-

... More
Electrical Items :

-

-

-

... More
Erection of double pole structure including fixing of T.P.M.O. (if available) top channel, fuse set on fuse set channel etc. as per standard specifications.

24

-

-

... More
Laying of H.T. Cable in the above digging, trench, covering with bricks, sand and back filling.

90

-

-

... More
Laying of cable H.T. cable through Hume/C.I./MS. Pipe in digged trench and back filling.

30

-

-

... More
Digging of cable trench in Kharanja Road (size of 30cm. Wide and 60 to 90 Cm. meter deep as per site requirement for laying of cable)-

30

-

-

... More
Excavation of foundation and taken out the damaged PCC pole to be replaced.

40

-

-

... More
Shifting of T/F from ground to plinth and re-connection of H.T. L.T. Lines as well as earthing for proper completion.

24

-

-

... More
Making of L.T. Shackle point by brackets, clamps, G.I. Shakle strips and insulators, tightening of line, binding of conductors and proper connections.

5

-

-

... More
Fabrication/modifications of M.S. Items as per requirement of site conditions.

140

-

-

... More
Mounting of cable box on pole as well as on H.T.P.B./Outdoor Metering Cubical/H.T.M.C. the work includes proper clamping of cable box on both ends With pipe (3Mtr. Long MS pipe will be provided by KESCo)

201

-

-

... More
Connection of H.T. Jumper from fuse set to H.T. Busing of the transformer.

25

-

-

... More
Repairing of 11 kv Junction box with enclosure and door

15

-

-

... More
Grouting of PCC pole with cement brick ballast and coarse sand as per Standard Spacification.

40

-

-

... More
Reparing of A panel distribution box MCCB and other auxiliary items.

25

-

-

... More
Loading, Carriage and unloading of STP poles from store to work site.

210

-

-

... More
Taking out (old & used) L.T. cable by digging of trench from site and then rolling in to bundles.

30

-

-

... More
Stringing of H.T./L.T. Cable in different sizes as same as H.T./L.T. overhead line 11 KV H.T. Cable

90

-

-

... More
Making plinth of Double Pole structure in size of 450x2250x600mm (200mm depth underground) with C.C. ratio 1:4:8 of cement, stone ballast and coarse sand including cost of materials.

24

-

-

... More
Opening of H.T. Jumpers from the existing 3 Phase 3 Wire H.T. O.H. line for erection work.

29

-

-

... More
Erection of Old/new Steel Tubular pole for H.T. O.H./ L.T. O.H. line and fitting of X-Arms/L.T. Brackets, insulators and other hardware fittings.

210

-

-

... More
Re-sagging of conductor, on old line after erection of pole, binding of conductor etc.

350

-

-

... More
Dismentalling of X-Arm/L.T. brackets and insulators etc. from the damaged pole/pole to be replaced/shifted.

110

-

-

... More
Disconnection of H.T./L.T. Lines, Shifting of T/F from ground to a safe place for construction of T/F plinth.

24

-

-

... More
Fixing of guarding angle/guarding channel for laying of guarding Old & New

160

-

-

... More
Loading, carriage & unloading of distribution Transformers (Up to 630 K.V.A.) from store to site & vise-versa.

25

-

-

... More
Cross lacing of guarding by G.I. wire (approximate 5 lacing of each span)

160

-

-

... More
Fixing of stay rod and its erection by fitting of stay clamp. Stay wire and its proper binding and tightening etc.

60

-

-

... More
Jumpering of L.T. Lines from the existing L.T.O.H. line.

60

-

-

... More
Taking out new/old L.T. Cable from cable drum and then after tranportation from store to work site or vice-versa.

120

-

-

... More
Reparing of T/F plinth, Size of the plinth will be 1.2 x 1.2 x 1.2 Cubic Mtr including civil matrial will be solid with brick work 75 mm thick C.C. in ratio 1:4:8 with cement, coarse sand and brick ballast with step.

24

-

-

... More
Deep Bore GI Pipe Earthing including supply Size GI Pipe 40mm dia, Thickness minimum 3 mm, B-Class 80 feet long with socket cutter and connection of pipe to distribution T/F Neutral or Body with 25x3mm G.I. Strip of length 80 feet inside the GI pipe, 100 Kg Salt and 100 Kg charcoal Powder for each earthing. all material shall be provided by contractor with cost of all material.

120

-

-

... More
Opening and reconnection of consumer connections for shifted/replaced of pole.

1600

-

-

... More
Making plinth of single pole of 400 mm dia, 600 mm height (200mm underground) with C.C. in ratio 1:4:8 of cements, stone ballast and coarse sand including cost of materials.

350

-

-

... More
Construction of T/F plinth, suitable for mounting of distribution transformer. Size of the plinth will be 1.2 x 1.2 x 1.2 meter solid with brick work. 75 mm thick C.C. in ratio 1:3:6 with cement, coarse sand and brick ballast laid on the base and 75 mm thick done on all the exposed sides to the plinth.

15

-

-

... More
Connection of L.T. cable from L.T.D.B to L.T.O.H.

25

-

-

... More
Laying of cable L.T. cable through Hume/C.I./MS. Pipe in digged trench and back filling.

30

-

-

... More
Loading, carriage and unloading of conductor from store to work site and vice versa

1500

-

-

... More
Making of H.T. Section points by brackets, clamps & Insulator, tightening of Line, binding of conductor & proper connection.

5

-

-

... More
Laying, stringing, tensioning and binding of Old & New Weasal conductor for H.T./L.T. O.H.

4000

-

-

... More
Reparing Distribution T/F fencing with all Material and Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.

61

-

-

... More
Increasing the pole length to Cross H.T./L.T. OH line by welding of M.S. pipe with all Material

30

-

-

... More
Digging of cable trench in Metallic Road (size of 30cm. Wide and 60 to 90 Cm. meter deep as per site requirement for laying of cable)-

120

-

-

... More
Laying, stringing, tensioning & final sagging of Earth wire/G.I. wire Old & New

2400

-

-

... More
To provide of Distribution T/F fencing of frame size 3x2.4 Mtr. including cost of M.S. Agnle size 40x40x5 and M.S. Flat size 35x5, fixing of welded steel wire fabric on steel frames by welding of 10 SWG wire fabric, including Painting of two coats of paint on iron based surfaces with ready mixed paint to give bus green shade including clening of oil & dust.

25

-

-

... More
Mounting & Erection of single phase distribution box Old & New.

600

-

-

... More
Erection of Tri-Pole structure including fitting of channels etc. and proper alignment.

5

-

-

... More
Erection of stud pole/fly stay and fixing of stay wire etc. for complete erection.

30

-

-

... More
Repairing of damaged S.T. Pole by providing M.S. ANGLE 65x65x6 mm(3 METER), Ms pole Clamp with Nut & Bolt(Clamping of both Ends), Concreting for Grouting and Muffing of pole with all material (2FEET Grouting And 1 feet Muffuing) and its welding including its all related work.

140

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.