Kanpur Development Authority Tender
... More
The KDA has issued a formal invitation for competitive bids for the Kanpur Development Authority project, for Beautification Work Of Pandit Deendayal Upadhyay Park Under Ward 72 I-1 Sector World Bank in Kanpur Nagar, Uttar Pradesh, with an estimated contract value of Rs. 24,14,284. The bid opening date for this tender is 27-05-2025 and the last date for bid submission is 04-06-2025. Interested bidders for Kanpur Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Kanpur Development Authority - KDA Tender
Housekeeping Services
Eprocure
Opening Date27 May 2025
Closing Date4 Jun 2025
Tender Amount₹ 24,14,284
Costs
EMD
₹ 50,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UPKDA_1043338_1Bid Award Id
ViewTender No
50/udhyan/kda/2024-25Tender Authority
Kanpur Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
P/laying (PCC) cement, concrete 4:2:1 of (20mm stone grit, c sand & cement including all materials, labour T&P S.I. 279 A
21.73
6750
-
... More
Class m-150 brick work in S/S with 1:4 C/C. Sand in mortar in supply of all materials labour T&P complete.
56.67
7500
-
... More
12 mm cement plaster with 1:4 cement & coarse sand mortarincluded in all materials, labours T&P etc all complete. S.I. no. 17.58
746.2
200
-
... More
Finishing walls with birla putty 1mm thick. all complete. S.I. New ch 15 S.O.R. 2023
746.2
135
-
... More
finishing walls with accylic emulsion paint of approved brand and manufacture and of required shade on undacorated wall surface to give etc all complete. (Ch 15 Si no 13.60.1
746.2
90
-
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
300
120
-
... More
Painting or Varnishing with primer coat of readymixed priming paints & Two Coat of appd. Superior Quality paint all complete(S.I. No. 641+19.29+642/15.1.2) ch-15 SOR.2023-24
11.07
103
-
... More
Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement: 3 coarse sand), including the cost of required centering, shuttering complete.
22.5
7450
-
... More
Construction of GSB by providing close graded material spreading in uniforme layers with motar grader on prepared surface mixing by mix in place method with rotawater at OMCand compacting with Vibratory roller to achive the desired denstiy complete as per class morth 401
56.25
3250
-
... More
Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only)
285
11
-
... More
sale of material ; dismetaled interlocking tiles (32 Tiles/SQM)
2736
23
-
... More
P/L 80mm Thick Interlocking tiles etc all complete.
375
925
-
... More
P/F RCC Benchs
10
8888
-
... More
P/Fixing Gym Apparatus all Complete.
-
-
-
... More
Fun Walker
1
46500
-
... More
Leg press cum standing Twister
1
50300
-
... More
Taichi Double
1
44800
-
... More
Fun cycle
1
30845
-
... More
Ski trainer
1
65200
-
... More
Step Trainer
1
61245
-
... More
Installation of 2 Hp Submersible Pump
1
86990
-
... More
P/F Play apparatus for kids
-
-
-
... More
Double Arc Swing
1
58321
-
... More
Horse Sea Saw
1
34295
-
... More
Zig Zag Slide 5 feet
1
81013
-
... More
Twin Climber
1
31009
-
... More
Horse MGR
1
75674
-
... More
(HORTICULTURE)
-
-
-
... More
Site Survey complete with measuring outer boundry of site and marking points for Plantation.
150
-
-
... More
Digging of pits following size
-
-
-
... More
0.60mx0.60mx0.60m
150
37
-
... More
Fertilizers
-
-
-
... More
Supply and mixing of Urea (@0.04 Kg/Plant) including, loading, unloading, cartage all.
6
6
-
... More
Supply and mixing of S.S.P. (@ 0.03Kg/Plant) including, loading, unloading, cartage all.
4.5
7
-
... More
Supply and mixing of M.O.P. (@0.03 Kg/Plant) including, loading, unloading, cartage all.
4.5
12
-
... More
Supply and mixing of F.Y.M. (@0.01Cum/Plant) including, loading, unloading, cartage all.
1.5
425
-
... More
Supply and mixing local sand @.01cum/plant
1.5
720
-
... More
Providing well developed Plants of Species (Average height 8'-12')
-
-
-
... More
Plumeriya Alba
50
400
-
... More
Pili Kaner/chandni/Hibiscuss
80
72
-
... More
Ficus blackiana/regionald/
20
210
-
... More
Supply and spraying of required quantity of antitermite i.e. Chloropyriphos 20E.C. @0.004Ltr/Plant
0.6
356
-
... More
One time Irrigation with Labour Charge
150
3
-
... More
One time Earth Work (Weeding & Cleaning)
150
1
-
... More
Maintenance of plants for first year including taking responsibility of all types including hoeing, watering, manuring, weeding and casualty replacement of damaged plant including, all labour T & P as required for proper completion of work as per direction by engineer incharge.
150
125
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements