Irrigation Department Tender

... More
The Irrigation Department has issued a formal invitation for competitive bids for Repair Work Of Old Ghats Built From Shringar Ghat To Bengali Ghat Under The Development And Restoration Work Of Ghats Of River Yamuna In District Mathura. in Mathura, Uttar Pradesh, with an estimated contract value of Rs. 6,53,50,000. The bid opening date for this tender is 27-02-2025 and the last date for bid submission is 04-04-2025. Interested bidders for Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Irrigation Department Tender

Opening Date27 Feb 2025
Closing DateCancelled
Tender Amount₹ 6,53,50,000 
Notes
Download

AI Insights

Bid Capacity
... View More
The bid capacity required to bid includes two key financial criteria: 1. Annual Financial Turnover: The bidder must have an annual financial turnover of not less than the estimated value of work in any one year during the last 5 financial years, updated to the current financial year price level at 7% per annum. The formula to update the annual financial turnover is: Annual Financial Turnover (updated) = Annual Financial Turnover (original) * (1 + 7%)^(current year - year of original turnover). 2. Average Annual Financial Turnover: The bidder must also have an average annual financial turnover of not less than 30% of the estimated value of work during the last 3 years, updated to the current financial year price level at 7% per annum. The formula for the average annual financial turnover is: Average Annual Financial Turnover (updated) = (Sum of Annual Financial Turnover for the last 3 years) / 3 * (1 + 7%)^(current year - year of original turnover). These criteria indicate the financial capacity a bidder must demonstrate to participate in the tender.
Technical Capacity
... View More
The bidder is required to have experience and competence to perform the contract. The experience in similar works should be at least 50% to 80% of the estimated value of work. Additionally, the bidder should have experience of at least 50% and 80% of similar works completed. There is also a mention of adjusting the annual financial turnover by 7% per annum to bring it to the current year price level. However, no specific amount is mentioned for the required prior work experience. The bidder should have average annual financial turnover in Civil works of not less than 30% of estimated value of work during the last 3 years, and not less than the estimated value of work in any one year during the last 5 financial years.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free

GEM & Bid Advisory Services

Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and Filling empty cement bags with local earth/RBM/silt, hand sewing with suja & sutli and placing in position within 60 M placing as directed by Engineer in charge & also including all cost material, labour & T&P etc. complete.

54962

-

-

... More
Shuttering (steel shuttering) for C.C. Blocks and concrete including cost of shuttering all labour, material and T&P etc. Complete.

114

-

-

... More
stone work ashlar sunk or moulded in cornices.

117

-

-

... More
stone work ashlar sunk or moulded or sunk and moulded or carved in : Circular or polygonal pillars

0.61

-

-

... More
Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete.

689430

-

-

... More
Earth work in removal of coffer dam & cross bar including all lead & lift with its proper disposal as per direction of Engineer-in-charge including cost of all material, labour and T&P etc. complete.

22070

-

-

... More
Dismantling of old damaged Red sand stone including cost of all material, labour and T&P etc. complete.

7524

-

-

... More
Supply and Laying 60 mm thick Red sand stone with 1:3 CM including cost of all material, labour and T&P etc. complete.

8026

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Related Tenders

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.