The Irrigation Department has issued a formal invitation for competitive bids for Reconstruction Of Vrb At Km 9.700 On Ranipur Dy in Gorakhpur, Uttar Pradesh. The bid opening date for this tender is 02-04-2021 and the last date for bid submission is 07-04-2021. Interested bidders for Irrigation Department tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Irrigation Department Tender
Eprocure
Opening Date2 Apr 2021
Closing Date7 Apr 2021
Tender AmountRefer Documents
Costs
EMD
₹ 16,000Document Cost
₹ 766Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_UPIDC_568209_46Tender No
05/EE/2020-21Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Boring with 150 mm dia casing pipe including lowering and extension of assembly loading unloading and carraige including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
20
-
-
... More
Taking out brick on edge soling laid on top of diversion and stacking with in 100 m after completion of construction required for proper completion of work.etc.
187.5
-
-
... More
Dry brick on Edge soling including on approch of VRB in both side with taking out brick from already used in diversion , excluding cost of brick, required for proper completion of work etc.
92.6
-
-
... More
Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal of excess earth as per direction of Engineer-in-charge.
87.36
-
-
... More
Earth work for making Ramp and correction of bank, Diversion and making jeepable service road including all cost of materials,T&P and labours and other accessories required for proper completion of work.
501.78
-
-
... More
Supply and fixing of P.V.C. pipe for drainage spout and weep hole including cost of all material,labour, t&p etc.required for proper completion of work
2
-
-
... More
Laying P.C.C. 1:3:6 in foundation with cement, sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (20 mm to 40 mm.) including all cost of materials,T&P and labours and other accessories required for proper completion of work.
10.2
-
-
... More
Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work
4
-
-
... More
Laying C.C. work in M-25 sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) Wearing coat 75mm thick top of the slab and parapet. including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per of direction of Engineer in Charge.
0.96
-
-
... More
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
4.01
-
-
... More
Dry brick on Edge soling including prepration of sub-grade to prescrib Slope ,filing joint with earth including all cost & labour,material& T&P etc.
187.5
-
-
... More
Dismelting of old V.R.B. and proper disposal including all cost of materials,T&P and labours etc.
49.44
-
-
... More
Laying R.C.C. work in 1:1:2 (M25) sonbhadra coarse sand of FM. Not less then 2.50 and dala grit (10mm to 20mm.) for Slab, pier cap and abutment cap stir including all cost of materials,T&P and labours and other accessories required for proper completion of work. As per direction of direction of Engineer in Charge.
6.11
-
-
... More
Runnig of 5 H.P. genrater set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work.
144
-
-
... More
Earth work for removal of diversion including all cost of material .T&P and labours required for proper completion of work.
474
-
-
... More
1st class brick work in 1:4 cement mortar with class brick M-150, sonbhadra coarse sand of FM. Not less then 2.50, including all cost of materials,T&P and labours and other accessories required for proper completion of work
23.56
-
-
... More
Providing one coat of bitumen with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. slab including cost of all material labour and T&P etc.
4.01
-
-
... More
Sign borad at site for notice both side including cost of all material ,labour, t&p etc. required for proper completion of worK.
2
-
-