Irrigation Department Tender

... More
The Irrigation Department has issued a formal invitation for competitive bids for Construction Of V.r.b. (r.c.c. Box Culvert) At Km. 85.595 Of Tarabgang Branch. in Gonda, Uttar Pradesh, with an estimated contract value of Rs. 33,57,000. The bid opening date for this tender is 24-05-2025 and the last date for bid submission is 30-05-2025. Interested bidders for Irrigation Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Irrigation Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 May 2025
Closing Date30 May 2025
Tender Amount₹ 33,57,000 
Notes
Download

Costs

Summary

Construction Of V.r.b. (r.c.c. Box Culvert) At Km. 85.595 Of Tarabgang Branch.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement plaster in 1:6 C.M. Upto 12mm thick with local sand on brick masornary of stopper wall including cost of all material , labour , T &P etc required for proper completion of the work.

37.52

-

-

... More
Earth work in excavation of foundation in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.

718.45

-

-

... More
Centering & shuttering for R.C.C. Work including cost of materials, upto 3M Span

156.8

-

-

... More
Centering & shuttering for C.C. Work including cost of materials.

27.174

-

-

... More
Laying P.C.C. in 1:3:6 in foundation with 20-40 mm size Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.

5.285

-

-

... More
Laying C.C. in 1:2:4 with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.

24.06

-

-

... More
Laying R.C.C. in 1:1:2 (M-25) in wall & slab with 10 to 20 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.

116.71

-

-

... More
1st class brick work with 1st class brick & coarse sand having fm not less than 2.0, including cost of all material, labour and T&P etc. required for proper completion of the work.

12.904

-

-

... More
S/F of 100 mm diadrainage spout pipe including cost of material, labour & T&P required for proper completion of the work.

3

-

-

... More
Cutting, bending, binding and placing steel reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work.

8.252

-

-

... More
Laying C.C. in 1:1:2 (M-25) in Wearing Coat with 4.75 to 10 mm size crushed Stone grit & coarse sand having F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of the work.

3.86

-

-

... More
Providing, laying, spreading and compacting stone aggregates of 22.4-53mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller applying and brooming, screening Type-B to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.

25.35

-

-

... More
Construction of un-reinforced, plain cement concrete pavement,thikness as per design, over a prepared sub base with 43 grade cement or as per clause 1501.2.2 M30@ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity appropriate weight batcher using approved mix design,laid in approved fixed side formwork(steel channel,laying and fixing of 125 micron thick polythene film,wedges ,steel plate including leweling the form work as per drawing),spreading the concrete with shovels,rakes,compacted using needle,screed and plate vibrators and finished in continious oparation including provision of contraction and expansion, construction joints and construction joints,admixtures as approved,curing of concrete slabs for 14 days,curing compound(where specified) and water finishing to lines and grades as per drawing and technical specification Clause 1501 in Lanes of City Portion.

25.35

-

-

... More
Dismantalling the old and damaged brick on edge soling from diversion after completion of c work including staking of dismantled bricks

127.5

-

-

... More
Dry brick on edge pitching on canal bank with old & dismantalled S.O.B. bricks including preparation subgrade and filling joints with local sand including cost of local sand but excluding cost of brick

76.5

-

-

... More
Supply & Laying of Local sand in filter work including cost Material ,labour and T&P etc.

5.5

-

-

... More
Supply & Laying of stone grit size 10 to 40 mm in filter work including cost material, labour and T&P etc.

5.5

-

-

... More
Supply and laying stone boulder 40-60 kg including cost of all material,Carriage upto site, loading, unloading, stacking etc. required for proper completion of work.

35.09

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.