Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Eprocure
Opening Date9 Feb 2019
Closing Date20 Feb 2019
Tender Amount₹ 1,47,00,00,000
Costs
EMD
₹ 2,94,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Part A Providing And Laying Cc Lining Of Dehra Feeder And Dys Of Bulandshahr Division Ganga Canal Bulandshahr
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_UPIDC_306013_1Bid Award Id
ViewTender No
10/SE/2018-19Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://https://irrigation.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in excavation with saturated soils including lead up to 30m . And lift up to 1.5m including dressing and making profile etc. complete.(PART-A BDGC)
349803
-
-
Ordinary centering and shuttring for CC work including cost of all material,Labour and T&P etc complete.(PART-A BDGC)
114898
-
-
Providing and laying cement concrete M10(1:3:6) with cement, coarse sand and 25 mm to 10 mm stone grit including cost of material,labour and T&P etc complete.(PART-A BDGC)
10484
-
-
providing and laying cement concrete M15(1:2:4) with cement, coarse sand and 10mm to 25 mm stone grit including cost of material,labour and T&P etc complete.(PART-A BDGC)
16952
-
-
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of material labour and T&P etc complete.(PART-A BDGC)
111571
-
-
12.5 mm thick cement plaster in 1:6 cement fine sand including cost of material, labour and T&P etc complete.(PART-A BDGC)
1109172
-
-
Supplying and laying 200 micron L.D.P.E film including cost of material, labour And T&P etc complete.(PART-A BDGC)
1127277
-
-
Painting on top of sleeper with (Bitumen s-35(60/70) or s-90(80/100) grade @ 01 kg/sqm including cost of material,labour and T&P etc complete.(PART-A BDGC)
63430
-
-
Providing and laying 75mm thick C.C m-15(1:2:4) lining with paver machine, Batching plant etc . Centering and shuttering including cost of material, labour an T&P etc complete.(PART-A BDGC)
960653
-
-
Making contraction groove in lined concrete surface a per drawing, including painting with sealing primer and joint groove filling with sealing compound, including cost of material labour and T&P etc complete.(PART-A BDGC)
191451
-
-
Making construction joint in lined concrete surface as per drawing, including painting with sealing primer and jiont filling with sealing compound ,including cost of material labour and T&P etc complete.(PART-A BDGC)
341432
-
-
Dewatring for execution of work i/c cost of all matterial abour T&P etc for completion of work per KWH for Dehra feeder.(PART-A BDGC)
10000
-
-
PART-B-ADGC
-
-
-
Uprooting jhunds including dressing and back filling. (PART-B ADGC)
37100
-
-
Earth work in excavation/cutting soils in making proper correcting section including lead up to 30.00 mtr. And lift up to 1.50 mtr including dressing and making profile etc complete.(PART-B ADGC)
28784.82
-
-
Earth work in excavation with saturated soils including lead up to 30.00mtr and lift up to 1.50 mtr including dressing and making profile etc complete . (PART-B ADGC)
36727.05
-
-
Oridinary centering and shuttering for c.c work including cost of all material, Labour and T&P etc complete.(PART-B ADGC)
31296.1
-
-
Providing and laying cement concrete M10(1:3:6) with cement coarse sand and 10mm to 25 mm tone grit including cost of material,labour and T&P etc complete.(PART-B ADGC)
2292.62
-
-
Providing and laying cement concrete M15(1:2:4) with cement,coarse sand and 10mm to 25 mm tone grit including cost of material, labour and T&P etc. complete.(PART-B ADGC)
2994.3
-
-
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of material laabour and T&P etc complete.(PART-B ADGC)
35443.39
-
-
12.5 m thick cement plaster in 1:6 cement fines sand including cost of material,labour and T&P etc complete.(PART-B ADGC)
351205.34
-
-
Supplying and laying 200 micron L.D.P.E film including cost of material, labour and T&P etc complete.(PART-B ADGC)
270791.4
-
-
Painting on top of sleepr with (Bitmen s-35(60/70) or 90(180/100) grade @ 01 kg/sqm. Including cost of material, labour and T&P etc complete.(PART-B ADGC)
15284.14
-
-
Providing and laying 75 mm thick C.C M-15(1:2:4) lining with paver machine, batching plant etc. Cenetring and shuttering including cost of material, labour and T&P etc complete.(PART-B ADGC)
18915.4
-
-
Making contraction groove in lined concrete surface as per drawing, including painting with sealng primer and joint groove filing with sealing compound, including cost of material labour and T&P etc complete.(PART-B ADGC)
46044.8
-
-
Making construction joint in lined concrete surface as per drawing, including painting with sealing primer and joint groove filling with sealing compound , including cost of material labour and T&P etc complete.(PART-B ADGC)
82741.04
-
-
Earth work in filing with ordinary oils including lead up to 1.00 km. and lift up to 1.50 mtr including dreing and manual compaction etc complete.(PART-B ADGC)
315328.13
-
-
providing and fixing 150 mm dia RCC hume pipe with coller joint including head and tail wall of Outlet and including cost material, labour and T&p etc complete. (PART-B ADGC)
410
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements