Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Eprocure
Opening Date9 Feb 2019
Closing Date20 Feb 2019
Tender Amount₹ 1,47,00,00,000 
Notes
Download

Costs

Summary

Part A Providing And Laying Cc Lining Of Dehra Feeder And Dys Of Bulandshahr Division Ganga Canal Bulandshahr

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation with saturated soils including lead up to 30m . And lift up to 1.5m including dressing and making profile etc. complete.(PART-A BDGC)

349803

-

-

... More
Ordinary centering and shuttring for CC work including cost of all material,Labour and T&P etc complete.(PART-A BDGC)

114898

-

-

... More
Providing and laying cement concrete M10(1:3:6) with cement, coarse sand and 25 mm to 10 mm stone grit including cost of material,labour and T&P etc complete.(PART-A BDGC)

10484

-

-

... More
providing and laying cement concrete M15(1:2:4) with cement, coarse sand and 10mm to 25 mm stone grit including cost of material,labour and T&P etc complete.(PART-A BDGC)

16952

-

-

... More
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of material labour and T&P etc complete.(PART-A BDGC)

111571

-

-

... More
12.5 mm thick cement plaster in 1:6 cement fine sand including cost of material, labour and T&P etc complete.(PART-A BDGC)

1109172

-

-

... More
Supplying and laying 200 micron L.D.P.E film including cost of material, labour And T&P etc complete.(PART-A BDGC)

1127277

-

-

... More
Painting on top of sleeper with (Bitumen s-35(60/70) or s-90(80/100) grade @ 01 kg/sqm including cost of material,labour and T&P etc complete.(PART-A BDGC)

63430

-

-

... More
Providing and laying 75mm thick C.C m-15(1:2:4) lining with paver machine, Batching plant etc . Centering and shuttering including cost of material, labour an T&P etc complete.(PART-A BDGC)

960653

-

-

... More
Making contraction groove in lined concrete surface a per drawing, including painting with sealing primer and joint groove filling with sealing compound, including cost of material labour and T&P etc complete.(PART-A BDGC)

191451

-

-

... More
Making construction joint in lined concrete surface as per drawing, including painting with sealing primer and jiont filling with sealing compound ,including cost of material labour and T&P etc complete.(PART-A BDGC)

341432

-

-

... More
Dewatring for execution of work i/c cost of all matterial abour T&P etc for completion of work per KWH for Dehra feeder.(PART-A BDGC)

10000

-

-

... More
PART-B-ADGC

-

-

-

... More
Uprooting jhunds including dressing and back filling. (PART-B ADGC)

37100

-

-

... More
Earth work in excavation/cutting soils in making proper correcting section including lead up to 30.00 mtr. And lift up to 1.50 mtr including dressing and making profile etc complete.(PART-B ADGC)

28784.82

-

-

... More
Earth work in excavation with saturated soils including lead up to 30.00mtr and lift up to 1.50 mtr including dressing and making profile etc complete . (PART-B ADGC)

36727.05

-

-

... More
Oridinary centering and shuttering for c.c work including cost of all material, Labour and T&P etc complete.(PART-B ADGC)

31296.1

-

-

... More
Providing and laying cement concrete M10(1:3:6) with cement coarse sand and 10mm to 25 mm tone grit including cost of material,labour and T&P etc complete.(PART-B ADGC)

2292.62

-

-

... More
Providing and laying cement concrete M15(1:2:4) with cement,coarse sand and 10mm to 25 mm tone grit including cost of material, labour and T&P etc. complete.(PART-B ADGC)

2994.3

-

-

... More
Providing and laying fine sand (Not less than 1.25 F.M.) in filter including cost of material laabour and T&P etc complete.(PART-B ADGC)

35443.39

-

-

... More
12.5 m thick cement plaster in 1:6 cement fines sand including cost of material,labour and T&P etc complete.(PART-B ADGC)

351205.34

-

-

... More
Supplying and laying 200 micron L.D.P.E film including cost of material, labour and T&P etc complete.(PART-B ADGC)

270791.4

-

-

... More
Painting on top of sleepr with (Bitmen s-35(60/70) or 90(180/100) grade @ 01 kg/sqm. Including cost of material, labour and T&P etc complete.(PART-B ADGC)

15284.14

-

-

... More
Providing and laying 75 mm thick C.C M-15(1:2:4) lining with paver machine, batching plant etc. Cenetring and shuttering including cost of material, labour and T&P etc complete.(PART-B ADGC)

18915.4

-

-

... More
Making contraction groove in lined concrete surface as per drawing, including painting with sealng primer and joint groove filing with sealing compound, including cost of material labour and T&P etc complete.(PART-B ADGC)

46044.8

-

-

... More
Making construction joint in lined concrete surface as per drawing, including painting with sealing primer and joint groove filling with sealing compound , including cost of material labour and T&P etc complete.(PART-B ADGC)

82741.04

-

-

... More
Earth work in filing with ordinary oils including lead up to 1.00 km. and lift up to 1.50 mtr including dreing and manual compaction etc complete.(PART-B ADGC)

315328.13

-

-

... More
providing and fixing 150 mm dia RCC hume pipe with coller joint including head and tail wall of Outlet and including cost material, labour and T&p etc complete. (PART-B ADGC)

410

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.