Hapur Pilakhua Development Authority Tender
... More
The HPDA has issued a formal invitation for competitive bids for the Hapur Pilakhua Development Authority project, for Textile Center Pilkhuwa Isthit O.h.t. Park Ki Boundaryboll Ka Nirman Karya. in Hapur, Uttar Pradesh, with an estimated contract value of Rs. 13,83,000. The bid opening date for this tender is 01-10-2019 and the last date for bid submission is 09-10-2019. Interested bidders for Hapur Pilakhua Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Oct 2019
Closing Date9 Oct 2019
Tender Amount₹ 13,83,000
Costs
EMD
₹ 69,150Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HPDA_387411_1Bid Award Id
ViewTender No
326/CE/HPDA/2019 DATED 25-09-2019 SBTender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.
1244
205260
165
... More
RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire.
23.5
188000
8000
... More
Deduction of cost of old brick bats obtained from dismantling of brick work.
51
-25500
500
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter (200 feet.).
102
40800
400
... More
RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 in raft foundation and footings excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire.
12
79800
6650
... More
M.S (tor steel or plain ) in work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authories overlaping shall be measured and including cost of binding wire.
53
296800
5600
... More
Deduction of cost of old brick obtained from dismantling of brick work.
23460
-100878
4.3
... More
Cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.In bedding of RCC pipes,including cost of form work in the trenches
8
41600
5200
... More
RCC work with cement, approved Coarse sand and 20mm stone grit in proportion of 1:1.5:3 for column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, T&P etc. required for proper completion of the work, including cost of binding wire.
9.5
76000
8000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements