Hapur Pilakhua Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Eprocure
Opening Date21 Oct 2019
Closing Date30 Oct 2019
Tender Amount₹ 30,82,000
Costs
EMD
₹ 1,54,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HPDA_394713_2Bid Award Id
ViewTender No
293/CE/HPDA/2019 DATED 19-10-2019 TBTender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying 50mm thick minimum compacted bituminous macadam on prepared surface with 100-120 tones per hour batch type Hot mix plant producing an average output of 75 MT per hour using crushed aggregated of specified grading-II(19mmNominal Size), premixed with 80/100 bituminous binder @ 3.25% by weight of total mix , transporting the hot mix material to work site, laying with a hydrostatic pavers finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory (8-10 tones) roller for initial brake down rolling, finish rolling by smooth wheeled tandem roller (8-10 tones) to achieve the desired compaction, including supply of all materials, labour T&P etc. required for proper completion of the work as per clause 504 of MORST&H specification sand as per direction of the Engineer in charge (A.R.)
252
-
6635.3
Providing and laying bitumenous concrete with 100-120 tonnes per hour batch type Hot mix plant producing an average output of 75 MT per hour using crushed agregated of specified grading-II premixed with 60 / 70 (VG30) bitumenous binder @ 5.00% by weight of total mix and hydrated lime @ 2% by weight of total mix , transporting the hot mix material to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled vibratory (8-10 tonnes) roller for initial brake down rolling, finish rolling by smooth wheeled tondom roller (8-10 tonnes) to achieve the desired compaction, including supply of all materials, labour T&P etc. required for proper completion of the work as per clause 509 of MORT & H specification sand as per direction of the Engineer in charge (A.R.)
126
-
8636.9
Providing & Laying hot applied Thermoplastic compound 2.5 mm thick including refletrorising glass beads as per I.R.C.35.the finish surface to be level ,uniform &free from streaks & holes composition of Thermo plastic material shall be as per Table 800-3 of clause 803 of M.O.R.T. & H. including cost of all material , Labour , T & P etc. required for proper completion of work as directed by Engineer in charge.
420
-
427.2
Deduction of cost of old brick obtained from dismantling of brick work.
21924
-
3.8
Deduction of cost of old brick bats obtained from dismantling of brick work.
44
-
700