If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Hapur Pilakhua Development Authority - HPDA Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date5 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 77,76,473
Costs
EMD
₹ 3,89,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HPDA_990513_1Tender No
311/SE/HPDA/2025Tender Authority
Hapur Pilakhua Development Authority ViewPurchaser Address
-Website
http://https://hpdaonline.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of un-reinforced plain cementconcrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriateweigh batcher using approved mix design, laid in approved fixed side formwork (steel) channel, laying and fixing of 125 micronthick polythene film, wedges, steel platesincluding levelling the formwork as perdrawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches bridge/culvert construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Floter-Trimix Flooring Cum and to Machine. Technical pecification Clause 1501.
517.5
8050
4165875
... More
RCC work in ratio 1:1.5:3 with cement and coarse sand and 200mm stone grit completion of work
5.99
8640
51710.4
... More
M.S (Tor steel or plain) work in plain work such as RCC or RB (SI.No 504 work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping shall be measured and including cost of binding wire
7.05
7502
52894.39
... More
PART B
-
-
-
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the engineer-in-charge within a distance of 60 meter(200 feet.).
100.05
600
60030
... More
Deduction of cost of old brick bats obtained from dismantling of brick work.
30.02
-600
-18009
... More
Deduction of cost of old brick obtained from dismantling of brick work.
5002
-6
-30012
... More
Concrete with 4 cm. gauge brick ballast fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tolls & plants etc required for proper completion of the work.
56.25
4000
225000
... More
M-150 Brick work in 1:4 cement & 4 coarse sand mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.
100.05
5170
517258.5
... More
12mm thick plaster with cement and coarse sand in 1:4 over brick work minimum thickness not to be less than 10mm thick including supply of all materials, labour and T & P etc. required for proper completion of the work.
345
200
69000
... More
Cement concrete with 2cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
28.46
7050
200643
... More
Supply and Engagement of Labour (For cleaning for drain)
100
390
39000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%